ISA 5.4 : 1991
Current
The latest, up-to-date edition.
INSTRUMENT LOOP DIAGRAMS
Hardcopy , PDF
English
09-09-1991
1 Purpose
2 Scope
3 Applications
3.1 Serve many purposes
3.2 Design
3.3 Construction
3.4 Start-up
3.5 Operation
3.6 Maintenance
3.7 Modification
4 Definitions
5 Content
6 Format
7 Symbols
7.1 Instrument connection and action information
7.2 General terminal of bulkhead symbol
7.3 Instrument terminals or ports
7.4 Instrument system energy supply
7.5 Identification of instrument action
8 Examples
ISA-5.4-1991, Instrument Loop Diagrams, provides a framework for creating and using instrument loop diagrams in various industries such as chemical, petroleum and power generation. It emphasizes the importance of these diagrams for design, construction, operation, maintenance and modification of instrumentation systems. It outlines the minimum content requirements for loop diagrams, including the identification of components, interconnections, energy sources and process lines. ISA-5.4 also discusses optional information that can enhance the effectiveness of the diagrams. It aims to improve communication between technical and non-technical personnel and to encourage participation in the standards development process. Additionally, it acknowledges the need for consistency in format and symbols used in the diagrams, referencing ISA-5.1 for instrumentation symbols and identification.
| Committee |
SP5.4
|
| DevelopmentNote |
Formerly it was ISA-S5.4 (05/2001) Supersedes ISA STDS & RP'S FOR INSTRUMENTATION. (07/2002)
|
| DocumentType |
Standard
|
| ISBN |
978-1-55617-227-4
|
| Pages |
22
|
| PublisherName |
International Society of Automation
|
| Status |
Current
|
| Supersedes |
| API RP 554-3 : 2008 | PROCESS CONTROL SYSTEMS - PROJECT EXECUTION AND PROCESS CONTROL SYSTEM OWNERSHIP |
| CSA C22.4 No. 1 : 2009(R2018) | OBJECTIVE-BASED INDUSTRIAL ELECTRICAL CODE |
| ISA 77.42.01 : 1999 : R2006 | FOSSIL FUEL POWER PLANT FEEDWATER CONTROL SYSTEM - DRUM TYPE |
| ISA RP60.4 : 1990 | DOCUMENTATION FOR CONTROL CENTERS |
| UFC 3-430-11 : 2001 | UNIFIED FACILITIES CRITERIA - BOILER CONTROL SYSTEMS |
| API 554-3 : 2008 : R2016 | PROCESS CONTROL SYSTEMS - PROJECT EXECUTION AND PROCESS CONTROL SYSTEM OWNERSHIP |
| ISA 77.42.01 : 1999 | FOSSIL FUEL POWER PLANT FEEDWATER CONTROL SYSTEM - DRUM TYPE |
| ISA 77.44.01 : 2007 | FOSSIL FUEL POWER PLANT - STEAM TEMPERATURE CONTROLS |
| ANSI/ISA-77.42.01-2019 | Fossil Fuel Power Plant Feedwater Control System |
| PIP PCEDO001 : 2015 | GUIDELINES FOR CONTROL SYSTEMS DOCUMENTATION |
| ISA-TR5.1.01/ISA-TR77.40.01:2012(R2016) | Functional Diagram Usage |
| ISA RP105.00.01 : 2017 | Management of a Calibration Program for Industrial Automation and Control Systems |