ISA 77.13.01 : 1999 : R2008
Current
The latest, up-to-date edition.
FOSSIL FUEL POWER PLANT STEAM TURBINE BYPASS SYSTEM
Hardcopy , PDF
English
01-01-2008
1 Scope<br>2 Purpose<br>3 Definitions<br>4 Bypass Systems<br> 4.1 General requirements<br> 4.2 Elements<br> 4.3 Capacity<br> 4.4 Design requirements<br> 4.5 Turbine bypass instrumentation<br> 4.6 Control and logic requirements<br> 4.7 Alarm requirements<br> 4.8 Operator interface<br>Annex A - References<br>Annex B - The use of bypass systems<br>Annex C - Valve life expectancy<br>Annex D - Some typical high- and low-pressure turbine bypass <br> valve <br>Annex E - Figures
Describes the design requirements and operator interface for steam turbine bypass systems for drum and once-through steam generators and combined cycle plants.
Committee |
SP77
|
DevelopmentNote |
Formerly it was ISA-S77.13.01 (05/2001)
|
DocumentType |
Standard
|
Pages |
42
|
ProductNote |
Reconfirmed 2008
|
PublisherName |
International Society of Automation
|
Status |
Current
|
FCI 70-2 : 2013 | CONTROL VALVE SEAT LEAKAGE |
MSS SP 61 : 2013 | PRESSURE TESTING OF VALVES |
ISA 51.1 : 1979 | PROCESS INSTRUMENTATION TERMINOLOGY |
ISA 5.1 : 1984 | INSTRUMENTATION SYMBOLS AND IDENTIFICATION |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.