ISA 77.20.01 : 2012
Current
The latest, up-to-date edition.
FOSSIL FUEL POWER PLANT SIMULATORS - FUNCTIONAL REQUIREMENTS
01-01-2012
1 Scope
2 Purpose
3 Definitions
4 General elements of a simulator
5 General requirements
6 Performance criteria
7 Simulator testing
8 Design control
9 Documentation
Annex A - Three types of simulators
Annex B - General modeling requirements
Annex C - General data requirements
Annex D - Specific documentation for three types of
simulators
Annex E - Simulation versus stimulation
Annex F - Related Standards
The scope of this standard is to address the simulation of fossil fuel power plants typically consisting of: Boiler, turbine, and balance of plant with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater Combustion turbine or combined cycle combustion turbine capacity of greater than 100MWs Associated or interactive processes
| DevelopmentNote |
Supersedes ISA 77.20. (08/2012)
|
| DocumentType |
Standard
|
| PublisherName |
International Society of Automation
|
| Status |
Current
|
| Supersedes |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.