• Shopping Cart
    There are no items in your cart

ISA 77.20.01 : 2012

Current

Current

The latest, up-to-date edition.

FOSSIL FUEL POWER PLANT SIMULATORS - FUNCTIONAL REQUIREMENTS

Published date

01-01-2012

Sorry this product is not available in your region.

1 Scope
2 Purpose
3 Definitions
4 General elements of a simulator
5 General requirements
6 Performance criteria
7 Simulator testing
8 Design control
9 Documentation
Annex A - Three types of simulators
Annex B - General modeling requirements
Annex C - General data requirements
Annex D - Specific documentation for three types of
          simulators
Annex E - Simulation versus stimulation
Annex F - Related Standards

The scope of this standard is to address the simulation of fossil fuel power plants typically consisting of:  Boiler, turbine, and balance of plant with steaming capacities of 200,000 lbs/hr (25 kg/s) or greater  Combustion turbine or combined cycle combustion turbine capacity of greater than 100MWs  Associated or interactive processes

DevelopmentNote
Supersedes ISA 77.20. (08/2012)
DocumentType
Standard
PublisherName
International Society of Automation
Status
Current
Supersedes

Access your standards online with a subscription

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.

Sorry this product is not available in your region.