ISA RP55.1 : 1975
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
HARDWARE TESTING OF DIGITAL PROCESS COMPUTERS
Hardcopy
31-08-2005
English
01-01-1983
1 Scope
2 Factors to be considered
2.1 Use of the standard
2.2 Methods of compliance
2.3 Sequence, duration, and location of tests
2.4 Acceptance criteria for tests
2.5 Quantity of hardware tested
2.6 Special functions
2.7 Test equipment
2.8 Cost of testing
3 Recommended test, central processing unit
3.1 Objectives
3.2 Equipment to be tested
3.3 Test procedures
4 Recommended tests, data processing input-output
subsystems
4.1 Objectives
4.2 Equipment to be tested
4.3 Test procedures
5 Recommended tests, digital inputs and outputs
5.1 Objectives
5.2 Equipment to be tested
5.3 Test procedures
6 Recommended tests, analog inputs
6.1 Objectives
6.2 Equipment to be tested
6.3 Test procedures
7 Recommended tests, analog outputs
7.1 Objectives
7.2 Equipment to be tested
7.3 Test procedures
8 Recommended tests, interacting system
8.1 Objectives
8.2 Equipment to be tested
8.3 Test procedures
9 Recommended tests, environmental
9.1 Objectives
9.2 Equipment to be tested
9.3 Test procedures
10 Documentation
10.1 Definition
10.2 Types of documents
10.3 Extent of documentation
10.4 User-vendor agreement
11 Glossary
11.1 Sources of definitions
11.2 Definitions
Appendix A - Analog input subsystem accuracy
Appendix B - Interacting systems
Appendix C - Environment
Identifies a basis for evaluation of functional hardware performance of digital process computers. Process computers are characterized by capability to acquire real-time data from a process in digital or analog form. Also, a process computer is usually capable of providing digital and analog control signals to the process. Deals with general recommendations covering all hardware performance testing, specific tests for relevant subsystems and system parameters, and a short glossary specifying terms used in the Recommended Practice. Detailed specifications are needed to define system acceptance criteria, and these should be negotiated between vendor and user before the system is contracted.
Committee |
SP55
|
DocumentType |
Standard
|
Pages |
94
|
PublisherName |
International Society of Automation
|
Status |
Withdrawn
|
UFC 3-430-11 : 2001 | UNIFIED FACILITIES CRITERIA - BOILER CONTROL SYSTEMS |
ISA 77.20 : 1993 : R2005 | FOSSIL FUEL POWER PLANT SIMULATORS - FUNCTIONAL REQUIREMENTS |
ISA 77.20 :1993 | FOSSIL FUEL POWER PLANT SIMULATORS - FUNCTIONAL REQUIREMENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.