• Shopping Cart
    There are no items in your cart

ISO 18077:2018

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

Reload startup physics tests for pressurized water reactors

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Withdrawn date

07-12-2022

Superseded by

ISO 18077:2022

Language(s)

English

Published date

27-03-2018

€60.00
Excluding VAT

ISO 18077:2018 applies to the reactor physics tests that are performed following a refuelling or other core alteration of a PWR for which nuclear design calculations are required. This document does not address the physics test program for the initial core of a commercial PWR[1].

ISO 18077:2018 specifies the minimum acceptable startup reactor physics test program to determine if the operating characteristics of the core are consistent with the design predictions, which provides assurance that the core can be operated as designed. This document does not address surveillance of reactor physics parameters during operation or other required tests such as mechanical tests of system components (for example the rod drop time test), visual verification requirements for fuel assembly loading, or the calibration of instrumentation or control systems (even though these tests are an integral part of an overall program to ensure that the core behaves as designed).

ISO 18077:2018 assumes that the same previously accepted analytical methods are used for both the design of the reactor core and the startup test predictions. It also assumes that the expected operation of the core will fall within the historical database established for the plant and/or sister plants.

When major changes are made in the core design, the test program should be reviewed to determine if more extensive testing is needed. Typical changes that might fall in this category include the initial use of novel fuel cycle designs, significant changes in fuel enrichments, fuel assembly design changes, burnable absorber design changes, and cores resulting from unplanned short cycles. Changes such as these may lead to operation in regions outside of the plant's experience database and therefore may necessitate expanding the test program.

[1] The good practices discussed in this document should be considered for use in the physics test program for the initial core of a commercial PWR. One test that provides useful information (without additional test time) is the hot-zero-power to hot-full-power reactivity measurement.

DevelopmentNote
Supersedes ISO/DIS 18077. (03/2018)
DocumentType
Standard
Pages
28
PublisherName
International Organization for Standardization
Status
Withdrawn
SupersededBy

Standards Relationship
BS ISO 18077:2018 Identical

ANS 19.5-1995 REQUIREMENTS FOR REFERENCE REACTOR PHYSICS MEASUREMENTS
ANS 3.1-2014 SELECTION, QUALIFICATION, AND TRAINING OF PERSONNEL FOR NUCLEAR POWER PLANTS
ANS 19.4 : 2017 A GUIDE FOR ACQUISITION AND DOCUMENTATION OF REFERENCE POWER REACTOR PHYSICS MEASUREMENTS FOR NUCLEAR ANALYSIS VERIFICATION
ANS 19.11 : 2017 CALCULATION AND MEASUREMENT OF THE MODERATOR TEMPERATURE COEFFICIENT OF REACTIVITY FOR PRESSURIZED WATER REACTORS
ANS 19.6.1-2011(R2016) RELOAD STARTUP PHYSICS TESTS FOR PRESSURIZED WATER REACTORS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.