ISO 18589-2:2007
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
Measurement of radioactivity in the environment Soil Part 2: Guidance for the selection of the sampling strategy, sampling and pre-treatment of samples
Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users
29-01-2019
English, French, Russian
03-12-2007
ISO 18589-2:2007 specifies the general requirements, based on ISO 11074 and ISO/IEC 17025, for all steps in the planning (desk study and area reconnaissance) of the sampling and the preparation of samples for testing. It includes the selection of the sampling strategy, the outline of the sampling plan, the presentation of general sampling methods and equipment, as well as the methodology of the pre-treatment of samples adapted to the measurements of the activity of radionuclides in soil.
ISO 18589-2:2007 is addressed to the people responsible for determining the radioactivity present in soil for the purpose of radiation protection. It is applicable to soil from gardens, farmland, urban or industrial sites, as well as soil not affected by human activities.
ISO 18589-2:2007 is applicable to all laboratories regardless of the number of personnel or the range of the testing performed. When a laboratory does not undertake one or more of the activities covered by ISO 18589-2:2007, such as planning, sampling or testing, the corresponding requirements do not apply.
DocumentType |
Standard
|
Pages |
26
|
PublisherName |
International Organization for Standardization
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
BS ISO 18589-2:2007 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.