• There are no items in your cart

ISO 22514-3:2008

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

Statistical methods in process management Capability and performance Part 3: Machine performance studies for measured data on discrete parts

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Withdrawn date

14-12-2020

Superseded by

ISO 22514-3:2020

Language(s)

English

Published date

07-02-2008

€60.00
Excluding VAT

ISO 22514-3:2008 prescribes the steps to be taken in conducting short-term performance studies that are typically performed on machines where parts produced consecutively under repeatability conditions are considered. The number of observations to be analysed will vary according to the patterns the data produce, or if the runs (the rate at which items are produced) on the machine are low in quantity. The methods are not recommended where the sample size produced is less than 30 observations. Methods to be used for handling the data and carrying out the calculations are described. In addition, machine performance indices and the actions required at the conclusion of a machine performance study are described.

ISO 22514-3:2008 is not applicable when tool wear patterns are expected to be present during the duration of the study, nor if autocorrelation between observations is present. The situation where a machine has captured the data, sometimes thousands of data points collected in a minute, is not considered suitable for the application of ISO 22514-3:2008.

DevelopmentNote
Supersedes ISO/DIS 22514-3. (02/2008)
DocumentType
Standard
Pages
23
PublisherName
International Organization for Standardization
Status
Withdrawn
SupersededBy

Standards Relationship
GOST R ISO 22514-3 : 2013 Identical
UNI ISO 22514-3 : 2010 Identical
ASQ/ANSI/ISO 22514-3 : 2008 Identical
BS ISO 22514-3:2008 Identical

BS ISO 13053-2:2011 Quantitative methods in process improvement. Six Sigma Tools and techniques
13/30265648 DC : 0 BS ISO 22514-8 - STATISTICAL METHODS IN PROCESS MANAGEMENT - CAPABILITY AND PERFORMANCE - PART 8: MACHINE PERFORMANCE OF A MULTI-STATES PRODUCTION PROCESS
BS ISO 22514-1:2014 Statistical methods in process management. Capability and performance General principles and concepts
UNE-ISO 22514-1:2017 Statistical methods in process management -- Capability and performance -- Part 1: General principles and concepts
BS ISO 22514-8:2014 Statistical methods in process management. Capability and performance Machine performance of a multi-state production process
UNE-ISO 26303:2013 Machine tools -- Short-term capability evaluation of machining processes on metal-cutting machine tools
UNI ISO/TR 18532 : 2010 Guide to the application of statistical methods for quality and standardization in the industrial sector
13/30286032 DC : 0 BS ISO 22514-1 - STATISTICAL METHODS IN PROCESS MANAGEMENT - CAPABILITY AND PERFORMANCE - PART 1: GENERAL PRINCIPLES AND CONCEPTS
09/30142128 DC : 0 BS ISO 11462-2 - GUIDELINES FOR IMPLEMENTATION OF STATISTICAL PROCESS CONTROL (SPC) - PART 2: CATALOGUE OF TOOLS AND TECHNIQUES
BS ISO 26303:2012 Machine tools — Short-term capability evaluation of machining processes on metal-cutting machine tools
ISO/TR 18532:2009 Guidance on the application of statistical methods to quality and to industrial standardization
UNI ISO 13053-2 : 2014 QUANTITATIVE METHODS IN PROCESS IMPROVEMENT - SIX SIGMA - PART 2: TOOLS AND TECHNIQUES
UNI ISO 11462-2 : 2014 GUIDELINES FOR IMPLEMENTATION OF STATISTICAL PROCESS CONTROL (SPC) - PART 2: CATALOGUE OF TOOLS AND TECHNIQUES
UNI ISO 22514-1 : 2014 STATISTICAL METHODS IN PROCESS MANAGEMENT - CAPABILITY AND PERFORMANCE - PART 1: GENERAL PRINCIPLES AND CONCEPTS
ISO 22514-1:2014 Statistical methods in process management — Capability and performance — Part 1: General principles and concepts
ISO 11462-2:2010 Guidelines for implementation of statistical process control (SPC) — Part 2: Catalogue of tools and techniques
ISO 13053-2:2011 Quantitative methods in process improvement — Six Sigma — Part 2: Tools and techniques
UNE-ISO 13053-2:2012 Quantitative methods in process improvement -- Six Sigma -- Part 2: Tools and techniques
ISO 26303:2012 Machine tools Short-term capability evaluation of machining processes on metal-cutting machine tools
ISO 22514-8:2014 Statistical methods in process management Capability and performance Part 8: Machine performance of a multi-state production process

ISO 7873:1993 Control charts for arithmetic average with warning limits
ISO 7870-1:2014 Control charts Part 1: General guidelines
ISO/TR 22514-4:2007 Statistical methods in process management Capability and performance Part 4: Process capability estimates and performance measures
ISO 3534-2:2006 Statistics — Vocabulary and symbols — Part 2: Applied statistics
ISO 21747:2006 Statistical methods Process performance and capability statistics for measured quality characteristics
ISO 5479:1997 Statistical interpretation of data — Tests for departure from the normal distribution
ISO 11462-1:2001 Guidelines for implementation of statistical process control (SPC) Part 1: Elements of SPC
ISO 3534-1:2006 Statistics — Vocabulary and symbols — Part 1: General statistical terms and terms used in probability

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.