• There are no items in your cart

ISO 7870-2:2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

Control charts — Part 2: Shewhart control charts

Available format(s)

Hardcopy , PDF , PDF 3 Users , PDF 5 Users , PDF 9 Users

Superseded date

14-03-2023

Superseded by

ISO 7870-2:2023

Language(s)

English

Published date

25-03-2013

€60.00
Excluding VAT

ISO 7870-2:2013 establishes a guide to the use and understanding of the Shewhart control chart approach to the methods for statistical control of a process.

ISO 7870-2:2013 is limited to the treatment of statistical process control methods using only the Shewhart system of charts. Some supplementary material that is consistent with the Shewhart approach, such as the use of warning limits, analysis of trend patterns and process capability is briefly introduced. There are, however, several other types of control chart procedures, a general description of which can be found in ISO 7870-1.

DocumentType
Standard
Pages
44
PublisherName
International Organization for Standardization
Status
Superseded
SupersededBy
Supersedes

Standards Relationship
BS ISO 7870-2:2013 Identical
UNE-ISO 7870-2:2017 Identical
JIS Z 9020-2:2016 Identical

NS-EN ISO 6508-3:2023 Metallic materials - Rockwell hardness test - Part 3: Calibration of reference blocks (ISO 6508-3:2023)

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.