12/30268386 DC : 0
|
BS EN 50700 - INFORMATION TECHNOLOGY - PREMISES DISTRIBUTION ACCESS NETWORK (PDAN) CABLING TO SUPPORT DEPLOYMENT OF OPTICAL BROADBAND NETWORKS |
BS ISO/IEC 11801-1:2017
|
Information technology. Generic cabling for customer premises General requirements |
PREN 50700 : DRAFT 2012
|
INFORMATION TECHNOLOGY - PREMISES DISTRIBUTION ACCESS NETWORK (PDAN) CABLING TO SUPPORT DEPLOYMENT OF OPTICAL BROADBAND NETWORKS |
16/30325966 DC : 0
|
BS ISO/IEC 11801-6 - INFORMATION TECHNOLOGY - GENERIC CABLING FOR CUSTOMER PREMISES - PART 6: DISTRIBUTED BUILDING SERVICES |
09/30211785 DC : 0
|
BS ISO/IEC 14763-2 - INFORMATION TECHNOLOGY - IMPLEMENTATION AND OPERATION OF CUSTOMER PREMISES CABLING - PART 2: PLANNING AND INSTALLATION |
BS EN 61280-4-1:2009
|
Fibre optic communication subsystem test procedures Installed cable plant. Multimode attenuation measurement |
BS ISO/IEC 11801-5:2017
|
Information technology. Generic cabling for customer premises Data centres |
CSA ISO/IEC 14543-3-7 : 2007 : R2012
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-7: MEDIA AND MEDIA DEPENDENT LAYERS - RADIO FREQUENCY FOR NETWORK BASED CONTROL OF HES CLASS 1 |
ISO/IEC 11801-2:2017
|
Information technology Generic cabling for customer premises Part 2: Office premises |
CSA ISO/IEC 14543-3-5 : 2008 : R2013
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-5: MEDIA AND MEDIA DEPENDENT LAYERS - POWERLINE FOR NETWORK BASED CONTROL OF HES CLASS 1 |
I.S. EN 61280-4-2:2014
|
FIBRE-OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES - PART 4-2: INSTALLED CABLE PLANT - SINGLE-MODE ATTENUATION AND OPTICAL RETURN LOSS MEASUREMENT |
PD IEC/TR 61282-14:2016
|
Fibre optic communication system design guides Determination of the uncertainties of attenuation measurements in fibre plants |
ISO/IEC 11801-4:2017
|
Information technology Generic cabling for customer premises Part 4: Single-tenant homes |
ISO/IEC 14763-2:2012
|
Information technology Implementation and operation of customer premises cabling Part 2: Planning and installation |
I.S. EN 50346:2003
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - TESTING OF INSTALLED CABLING |
ISO/IEC 24702:2006
|
Information technology Generic cabling Industrial premises |
ISO/IEC 14543-3-4:2007
|
Information technology Home electronic system (HES) architecture Part 3-4: System management Management procedures for network based control of HES Class 1 |
ISO/IEC 14543-3-6:2007
|
Information technology Home electronic system (HES) architecture Part 3-6: Media and media dependent layers Network based on HES Class 1, twisted pair |
EN 61280-4-2:2014
|
Fibre-optic communication subsystem test procedures - Part 4-2: Installed cable plant - Single-mode attenuation and optical return loss measurement |
EN 61280-4-1:2009
|
FIBRE OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES - PART 4-1: INSTALLED CABLE PLANT - MULTIMODE ATTENUATION MEASUREMENT |
EN 50700:2014
|
Information technology - Premises distribution access network (PDAN) cabling to support deployment of optical broadband networks |
EN 50346 : 2002 AMD 2 2009
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - TESTING OF INSTALLED CABLING |
BS EN 61280-4-2:2014
|
Fibre-optic communication subsystem test procedures Installed cable plant. Single-mode attenuation and optical return loss measurement |
16/30325955 DC : 0
|
BS ISO/IEC 11801-5 - INFORMATION TECHNOLOGY - GENERIC CABLING FOR CUSTOMER PREMISES - PART 5: DATA CENTRES |
BS EN 50346 : 2002
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - TESTING OF INSTALLED CABLING |
CAN/CSA-ISO/IEC 14543-3-3-07 (R2017)
|
Information Technology - Home Electronic System (HES) Architecture - Part 3-3: User Process for Network Based Control of HES Class 1 (Adopted ISO/IEC 14543-3-3:2007, first edition, 2007-01) |
CSA ISO /IEC 14543-3-4 : 2007
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-4: SYSTEM MANAGEMENT - MANAGEMENT PROCEDURES FOR NETWORK BASED CONTROL OF HES CLASS 1 |
ISO/IEC 11801-1:2017
|
Information technology — Generic cabling for customer premises — Part 1: General requirements |
CSA ISO/IEC 14543-3-4 : 2007 : R2012
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-4: SYSTEM MANAGEMENT - MANAGEMENT PROCEDURES FOR NETWORK BASED CONTROL OF HES CLASS 1 |
IEC TR 61282-11:2012
|
Fibre optic communication system design guides - Part 11: Multimode launch conditions |
BS PD ISO/IEC TR 29106 : 2007
|
INFORMATION TECHNOLOGY - GENERIC CABLING - INTRODUCTION TO THE MICE ENVIRONMENTAL CLASSIFICATION |
BS EN 50174-1 : 2009
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
IEC TR 62614-2:2015
|
Fibre optics - Multimode launch conditions - Part 2: Determination of launch condition requirements for measuring multimode attenuation |
IEC 61280-4-1:2009
|
Fibre-optic communication subsystem test procedures - Part 4-1: Installed cable plant - Multimode attenuation measurement |
I.S. EN 61918:2013
|
INDUSTRIAL COMMUNICATION NETWORKS - INSTALLATION OF COMMUNICATION NETWORKS IN INDUSTRIAL PREMISES |
16/30325974 DC : 0
|
BS ISO/IEC 11801-2 - INFORMATION TECHNOLOGY - GENERIC CABLING FOR CUSTOMER PREMISES - PART 2: OFFICE PREMISES |
16/30325952 DC : 0
|
BS ISO/IEC 11801-4 - INFORMATION TECHNOLOGY - GENERIC CABLING FOR CUSTOMER PREMISES - PART 4: HOMES |
BS ISO/IEC 11801-2:2017
|
INFORMATION TECHNOLOGY - GENERIC CABLING FOR CUSTOMER PREMISES - PART 2: OFFICE PREMISES |
CEI EN 61280-4-1 : 2011
|
FIBRE OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES - PART 4-1: INSTALLED CABLE PLANT - MULTIMODE ATTENUATION MEASUREMENT |
BS IEC/IEEE 62582-5:2015
|
Nuclear power plants. Instrumentation and control important to safety. Electrical equipment condition monitoring methods Optical time domain reflectometry |
ISO/IEC 11801-6:2017
|
Information technology Generic cabling for customer premises Part 6: Distributed building services |
CEI EN 61280-4-2 : 2015
|
FIBRE-OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES - PART 4-2: INSTALLED CABLE PLANT - SINGLE-MODE ATTENUATION AND OPTICAL RETURN LOSS MEASUREMENT |
ISO/IEC 14762:2009
|
Information technology Functional safety requirements for Home and Building Electronic Systems (HBES) |
CSA ISO/IEC 14543-3-3 : 2007
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-3: USER PROCESS FOR NETWORK BASED CONTROL OF HES CLASS 1 |
CSA ISO/IEC 14543-3-5 : 2008
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-5: MEDIA AND MEDIA DEPENDENT LAYERS - POWERLINE FOR NETWORK BASED CONTROL OF HES CLASS 1 |
I.S. EN 50174-1:2009
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
ISO/IEC 30129:2015
|
Information technology Telecommunications bonding networks for buildings and other structures |
ISO/IEC 14543-3-7:2007
|
Information technology Home electronic system (HES) architecture Part 3-7: Media and media dependent layers Radio frequency for network based control of HES Class 1 |
ISO/IEC 14543-3-5:2007
|
Information technology Home electronic system (HES) architecture Part 3-5: Media and media dependent layers Power line for network based control of HES Class 1 |
IEC 61918:2013
|
Industrial communication networks - Installation of communication networks in industrial premises |
BS EN 61918:2013
|
Industrial communication networks. Installation of communication networks in industrial premises |
10/30240050 DC : DRAFT DEC 2010
|
BS EN 61280-4-2 - FIBRE-OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES - PART 4-2: INSTALLED CABLE PLANT - SINGLEMODE ATTENUATION AND OPTICAL RETURN LOSS MEASUREMENT |
11/30244353 DC : 0
|
BS EN 61753-123-2 - FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS - PERFORMANCE STANDARD - PART 123-2: SIMPLEX AND DUPLEX REFERENCE CORDS WITH SINGLE-MODE FIBRE AND CYLINDRICAL FERRULE CONNECTORS |
PD IEC/TR 61282-11:2012
|
Fibre optic communication system design guides Multimode launch conditions |
15/30326655 DC : 0
|
BS EN 61280-4-1 - FIBRE-OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES - PART 4-1: INSTALLED CABLE PLANT - MULTIMODE ATTENUATION MEASUREMENT |
09/30211750 DC : 0
|
BS EN 50174-1:200/PRA1:2 - INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
BS EN 50700:2014
|
Information technology. Premises distribution access network (PDAN) cabling to support deployment of optical broadband networks |
16/30325949 DC : 0
|
BS ISO/IEC 11801-3 - INFORMATION TECHNOLOGY - GENERIC CABLING FOR CUSTOMER PREMISES - PART 3: INDUSTRIAL PREMISES |
16/30325971 DC : 0
|
BS ISO/IEC 11801-1 - INFORMATION TECHNOLOGY - GENERIC CABLING FOR CUSTOMER PREMISES - PART 1: GENERAL REQUIREMENTS |
ISO/IEC 11801-5:2017
|
Information technology Generic cabling for customer premises Part 5: Data centres |
CAN/CSA-ISO/IEC 14543-3-7-07 (R2017)
|
Information Technology - Home Electronic System (HES) Architecture - Part 3-7: Media and Media Dependent Layers - Radio Frequency for Network Based Control of HES Class 1 (Adopted ISO/IEC 14543-3-7:2007, first edition, 2007-01) |
UFC 3-580-01 : Change 1
|
UNIFIED FACILITIES CRITERIA - TELECOMMUNICATIONS INTERIOR INFRASTRUCTURE PLANNING AND DESIGN |
CSA ISO/IEC 14543-3-3 : 2007 : R2012
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-3: USER PROCESS FOR NETWORK BASED CONTROL OF HES CLASS 1 |
CSA ISO/IEC 14543-3-6 : 2007 : R2012
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-6: MEDIA AND MEDIA DEPENDENT LAYERS - TWISTED PAIR FOR NETWORK BASED CONTROL OF HES CLASS 1 |
IEEE 802.3-2012
|
ETHERNET - CORRIGENDUM 1: MULTI-LANE TIMESTAMPING |
ISO/IEC 14543-3-3:2007
|
Information technology Home electronic system (HES) architecture Part 3-3: User process for network based control of HES Class 1 |
ISO/IEC TR 29106:2007
|
Information technology Generic cabling Introduction to the MICE environmental classification |
EN 50174-1:2009/A2:2014
|
INFORMATION TECHNOLOGY - CABLING INSTALLATION - PART 1: INSTALLATION SPECIFICATION AND QUALITY ASSURANCE |
IEC 61280-4-2:2014
|
Fibre-optic communication subsystem test procedures - Part 4-2: Installed cable plant - Single-mode attenuation and optical return loss measurement |
BS ISO/IEC 30129 : 2015
|
INFORMATION TECHNOLOGY - TELECOMMUNICATIONS BONDING NETWORKS FOR BUILDINGS AND OTHER STRUCTURES |
CSA ISO/IEC 14762 : 2010
|
INFORMATION TECHNOLOGY - FUNCTIONAL SAFETY REQUIREMENTS FOR HOME AND BUILDING ELECTRONIC SYSTEMS (HBES) |
11/30247511 DC : 0
|
BS EN 61753-124-2 - FIBRE OPTIC INTERCONNECTING DEVICES AND PASSIVE COMPONENTS - PART 124-2: SIMPLEX AND DUPLEX REFERENCE CORDS WITH MULTIMODE FIBRE AND CYLINDRICAL FERRULE CONNECTORS FOR CATEGORY C - CONTROLLED ENVIRONMENT |
14/30189466 DC : 0
|
BS IEC/IEEE 62582-5 ED 1.0 - NUCLEAR POWER PLANTS - INSTRUMENTATION AND CONTROL IMPORTANT TO SAFETY - ELECTRICAL EQUIPMENT CONDITION MONITORING METHODS - PART 5: OPTICAL TIME DOMAIN REFLECTOMETRY |
CAN/CSA-ISO/IEC 14543-3-4-07 (R2017)
|
Information Technology - Home Electronic System (HES) Architecture - Part 3-4: System Management - Management Procedures for Network Based Control of HES Class 1 (Adopted ISO/IEC 14543-3-4:2007, first edition, 2007-01) |
CSA ISO/IEC 14543-3-6 : 2007
|
INFORMATION TECHNOLOGY - HOME ELECTRONIC SYSTEM (HES) ARCHITECTURE - PART 3-6: MEDIA AND MEDIA DEPENDENT LAYERS - TWISTED PAIR FOR NETWORK BASED CONTROL OF HES CLASS 1 |
CAN/CSA-ISO/IEC 14543-3-6-07 (R2017)
|
Information Technology - Home Electronic System (HES) Architecture - Part 3-6: Media and Media Dependent Layers - Twisted Pair for Network Based Control of HES Class 1 (Adopted ISO/IEC 14543-3-6:2007, first edition, 2007-01) |
ISO/IEC 11801-3:2017
|
Information technology Generic cabling for customer premises Part 3: Industrial premises |
I.S. EN 61280-4-1:2009
|
FIBRE OPTIC COMMUNICATION SUBSYSTEM TEST PROCEDURES - PART 4-1: INSTALLED CABLE PLANT - MULTIMODE ATTENUATION MEASUREMENT |
I.S. EN 50700:2014
|
INFORMATION TECHNOLOGY - PREMISES DISTRIBUTION ACCESS NETWORK (PDAN) CABLING TO SUPPORT DEPLOYMENT OF OPTICAL BROADBAND NETWORKS |
EN 61918:2013/AC:2014
|
INDUSTRIAL COMMUNICATION NETWORKS - INSTALLATION OF COMMUNICATION NETWORKS IN INDUSTRIAL PREMISES (IEC 61918:2013, MODIFIED) |
11/30258071 DC : 0
|
BS EN 61918 - INDUSTRIAL COMMUNICATION NETWORKS - INSTALLATION OF COMMUNICATION NETWORKS IN INDUSTRIAL PREMISES |