JIS C 1736-2:2009
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Instrument transformers for metering service Part 2: Measuring instruments used in transaction or certification
Hardcopy , PDF
09-03-2022
English, Japanese
20-04-2009
This Japanese Industrial Standard specifies the instrument transformer for metering service used in combination with a watt-hour meter, a var-hour meter or a maximum demand watt-hour meter, which is used in the measurement on transaction or certification.
DocumentType |
Standard
|
Pages |
19
|
PublisherName |
Japanese Standards Association
|
Status |
Superseded
|
SupersededBy |
Reaffirmed 2014 2009(R2014) [20/10/2014]2009 [20/04/2009]
JIS C 1736-1:2009 | Instrument transformers for metering service -- Part 1: General measuring instrument |
JIS C 1283-2:2009 | Watt-hour, var-hour and maximum demand indicators for telemetering Part 2: Measuring instruments used transaction or certification |
JIS C 1263-2:2009 | Var-hour meters Part 2: Measuring instruments used in transaction or certification |
JIS C 1216-2:2009 | Alternating-current watt-hour meters (for connection through instrument transformer) Part 2: Measuring instruments used in transaction or certification |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.