MIL-A-46556 Revision B:1966
Current
The latest, up-to-date edition.
Actuator, Explosive, Linear, M2 Loading, Assembling, and Packing
20-06-1966
1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
4. QUALITY ASSURANCE PROVISIONS
5. PREPARATION FOR DELIVERY
6. NOTES
Describes loading, assembling and packing of M2 type of electrically actuated, gas operated power source.
| DevelopmentNote |
B NOTICE 1 - Notice of Validation. B NOTICE 2 - Notice of Inactivation for new design. (05/2004) B NOTICE 3 - Notice of Validation but remains Inactive for New Design. (10/2013)
|
| DocumentType |
Standard
|
| Pages |
18
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Current
|
This specification covers the quality assurance provisions, and special requirements not covered by the drawings, for the loading, assembling and packing of one type of electrically actuated, gas operated power source designated as Actuator, Explosive, Linear, M2.
| MIL-I-45607 Revision C:1987 | Inspection Equipment, Acquisition, Maintenance and Disposition of |
| MIL-A-2550 Revision B:1973 | Ammunition, General Specification for |
| MIL-STD-1168 Revision C:2014 | Ammunition Lot Numbering and Ammunition Data Card |
| MIL-STD-1235 Revision C:1988 | SINGLE AND MULTILEVEL CONTINUOUS SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES (NO S/S DOCUMENT) |
| MIL-STD-109 Revision C:1994 | QUALITY ASSURANCE TERMS AND DEFINITIONS (REFER TO AN ACCEPTABLE NON-GOVERNMENT STANDARD SUCH AS ISO-8402 OR ASQC-A8402) |
| MIL-STD-1167 Revision C:1985 | Ammunition Data Card (S/S by MIL-STD-1168) |
| MIL-STD-105 Revision E:1989 | Sampling Procedures and Tables for Inspection by Attributes (See Notice 3 for Replacement Information) |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.