• Shopping Cart
    There are no items in your cart

MIL-B-46667 Revision A:1963

Current

Current

The latest, up-to-date edition.

BURSTER, PROJECTILE, M83 LOADING, ASSEMBLING AND PACKING

Available format(s)

PDF

€17.95
Excluding VAT

1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
4. QUALITY ASSURANCE PROVISIONS
5. PREPARATION FOR DELIVERY
6. NOTES

Describes loading, assembling and packing of M83 projectile burster.

Committee
FSC 1320
DevelopmentNote
A NOTICE 1 - Notice of Validation. A NOTICE 2 - Notice of Inactivation for new design. (06/2004) A NOTICE 3 - Notice of Validation but remains Inactive for New Design. (11/2013)
DocumentType
Standard
Pages
20
PublisherName
US Military Specs/Standards/Handbooks
Status
Current

MIL-I-45607 Revision C:1987 Inspection Equipment, Acquisition, Maintenance and Disposition of
MIL-A-2550 Revision B:1973 AMMUNITION, GENERAL SPECIFICATION FOR
MIL-STD-1235 Revision C:1988 SINGLE AND MULTILEVEL CONTINUOUS SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES FUNCTIONAL CURVES OF THE CONTINUOUS SAMPLING PLANS
MIL-STD-109 Revision C:1994 QUALITY ASSURANCE TERMS AND DEFINITIONS
MIL-A-48078 Revision A:1988 AMMUNITION, STANDARD QUALITY ASSURANCE PROVISIONS, GENERAL SPECIFICATION FOR
MIL-P-116 Revision J:1988 PRESERVATION, METHODS OF
MIL-STD-105 Revision E:1989 SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES
MIL-R-11470 Revision A:1971 RADIOGRAPHIC INSPECTION, QUALIFICATION OF EQUIPMENT, OPERATORS AND PROCEDURES

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.