MIL-C-10405-7 Revision A:1967
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Crystal Unit, CR-10/U (No S/S Document)
18-09-1967
17-07-1990
1 SCOPE
2 APPLICABLE DOCUMENTS
3 REQUIREMENTS
4 QUALITY ASSURANCE PROVISIONS
5 PREPARATION FOR DELIVERY
6 NOTES
Describes the detail requirements for crystal unit CR-10/U.
| DevelopmentNote |
A NOTICE 1 - Notice of Cancellation without replacement. (06/2004)
|
| DocumentType |
Standard
|
| Pages |
3
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Withdrawn
|
This specification covers the detail requirements for the crystal unit CR-10/U. These crystal units have a quartz vibrator pressure mounted in a metal holder, Type HC-17/U, and are designed to operate at antiresonance, into a load capacitance of 25 pf, on the fundamental frequency of the vibrator, under noncontrolled temperature conditions, at a specified frequency of 5000 kilohertz (kHz).
| MIL-C-10405 Revision A:1954 | Crystal Units, Quartz, Pressure and Spacer Mounted, General Specification for (No S/S Document) |
| MIL-H-10056-8 Revision B:1975 | Holder (Enclosure), Crystal, Type HC-17/U (No S/S Document) |
| MIL-STD-202 Revision H:2015 | Electronic and Electrical Component Parts |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.