MIL-DTL-63245 Revision C:2008
Current
Current
The latest, up-to-date edition.
Projectile 155 Millimeter: HE, Metal Parts Assembly, M795
Available format(s)
PDF
Published date
14-01-2008
Publisher
€15.75
Excluding VAT
1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
4. VERIFICATION
5. PACKAGING
6. NOTES
Specifies requirements for the manufacturing and assembly of the metal parts for Projectile, HE, 155 MM, M795.
| DevelopmentNote |
Supersedes MIL P 63245 (B). (02/2008)
|
| DocumentType |
Standard
|
| Pages |
153
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Current
|
| Supersedes |
This specification covers requirements for the manufacturing and assembly of the metal parts for Projectile, HE, 155MM, M795 (see 6.1).
| MIL-STD-1168 Revision C:2014 | Ammunition Lot Numbering and Ammunition Data Card |
| MIL-STD-1916 Base Document:1996 | DOD Preferred Methods for Acceptance of Product |
| ASTM E 10 : 2017-05 | TEST METHOD FOR BRINELL HARDNESS OF METALLIC MATERIALS |
| ASTM E 103 : 2017 : REDLINE | Standard Practice for Rapid Indentation Hardness Testing of Metallic Materials |
| ASTM E 1444 : 2005 | Standard Practice for Magnetic Particle Testing |
| ASTM E 8 : 2004 | Standard Test Methods for Tension Testing of Metallic Materials |
| TT-C-490 Revision F:2013 | Chemical Conversion Coatings and Pretreatments for Metallic Substrates (Base for Organic Coatings) |
Summarise