MIL-DTL-70526 Revision B:2009
Current
The latest, up-to-date edition.
Projectile, 105 Millimeter, HE, RA- M913/M927, Delay Assembly for
06-04-2009
1. SCOPE
2. APPLICABLE DOCUMENTS
3. REQUIREMENTS
4. VERIFICATION
5. PACKAGING
6. NOTES
Describes requirements and quality assurance provisions for the fabrication and packaging of parts and assembly of the delay assembly for the 105 MM, High Explosive, Rocket Assisted, M913/M927 Projectiles.
DevelopmentNote |
Inactive for New Design. Supersedes MIL P 70526 (A). (06/2009) B NOTICE 1 - Notice of Validation but remains Inactive for New Design. (01/2014)
|
DocumentType |
Standard
|
Pages |
28
|
PublisherName |
US Military Specs/Standards/Handbooks
|
Status |
Current
|
This specification contains requirements and quality assurance provisions for the fabrication and packaging of parts and assembly of the delay assembly for the 105MM, High Explosive, Rocket Assisted, M913 / M927 Projectiles.
ASTM B 430 : 1997 | Standard Test Method for Particle Size Distribution of Refractory Metal Powders and Related Compounds by Turbidimetry |
MIL-T-48140 Base Document:1973 | TUNGSTEN POWDER (FOR PYROTECHNICS) |
MIL-STD-1168 Revision C:2014 | Ammunition Lot Numbering and Ammunition Data Card |
MIL-STD-1916 Base Document:1996 | DOD PREFERRED METHODS FOR ACCEPTANCE OF PRODUCT |
MIL-STD-1234 Base Document:1962 | PYROTECHNICS, SAMPLING, INSPECTION AND G |
MIL-V-50433 Base Document:1969 | VINYL ALCOHOL - ACETATE RESIN SOLUTION (VAAR) (FOR USE IN AMMUNITION) |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.