MIL-P-60026 Base Document:1964
Current
Current
The latest, up-to-date edition.
PRIMER, STAB, M97 LOADING, ASSEMBLING AND PACKING
Available format(s)
PDF
Publisher
Outlines prerequisites not normally required by the drawings and gives quality assurance provisions for the loading, assembling and packing for one kind of initiating device called Primer, Stab, M97.
Committee |
FSC 1375
|
DevelopmentNote |
NOTICE 1 - Notice of Validation. NOTICE 2 - Notice of Inactivation for New Design. NOTICE 3 - Notice of Validation but remains Inactive for New Design. (11/2013)
|
DocumentType |
Standard
|
Pages |
18
|
PublisherName |
US Military Specs/Standards/Handbooks
|
Status |
Current
|
MIL-I-45607 Revision C:1987 | Inspection Equipment, Acquisition, Maintenance and Disposition of |
MIL-A-2550 Revision B:1973 | AMMUNITION, GENERAL SPECIFICATION FOR |
MIL-STD-1235 Revision C:1988 | SINGLE AND MULTILEVEL CONTINUOUS SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES FUNCTIONAL CURVES OF THE CONTINUOUS SAMPLING PLANS |
MIL-I-45208 Revision A:1963 | INSPECTION SYSTEM REQUIREMENTS |
MIL-STD-109 Revision C:1994 | QUALITY ASSURANCE TERMS AND DEFINITIONS |
MIL-STD-105 Revision E:1989 | SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY ATTRIBUTES |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.