MIL-P-63311 Base Document:1979
Current
The latest, up-to-date edition.
Primer, Electric, M83 Loading, Assembling and Packing
29-06-1979
Requirements and quality assurance criteria for loading, assembling and packing of Primer, Electric, M83.
| DevelopmentNote |
NOTICE 1 - Notice of Inactivation for New Design. NOTICE 2 - Notice of Validation but remains Inactive for New Design. (01/2014)
|
| DocumentType |
Standard
|
| Pages |
48
|
| PublisherName |
US Military Specs/Standards/Handbooks
|
| Status |
Current
|
This specification contains requirements not covered by the drawings and provides quality assurance provisions for loading, assembling and packing of Primer, Electric, M83 (Alternate).
| MIL-E-46215 Revision C:1975 | Element, Ignition, Electric Metal Parts Assembly, for Electric Primers, M80A1, M83 and M120 |
| MIL-STD-1234 Base Document:1962 | Pyrotecnics: Sampling, Inspection and Testing |
| MIL P 223 : B | POWDER, BLACK |
| MIL-A-48078 Revision A:1988 | Ammunition, Standard Quality Assurance Provisions, General Specification for |
| MIL-P-116 Revision J:1988 | PRESERVATION, METHODS OF (S/S BY MIL-STD-2073-1) |
| MIL-STD-286 Revision C:1991 | Propellants, Solid: Sampling, Examination and Testing |
| MIL-STD-105 Revision E:1989 | Sampling Procedures and Tables for Inspection by Attributes (See Notice 3 for Replacement Information) |
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.