MIL-S-46119 Revision C:1988
Current
The latest, up-to-date edition.
Steel Forgings, Tubular Parts for Cannon
26-10-1988
Describes alloy steel forgings produced by hot plastic deformation process such as pressing, hammering, upsetting, extruding or combination of these. Includes minimum Engineering and Packaging Requirements and Quality Assurance Provisions.
DevelopmentNote |
C NOTICE 1 - Notice of Inactivation for New Design. C NOTICE 2 - Notice of Reactivation. (02/2000) C NOTICE 3 - Notice of Validation. (04/2013) C NOTICE 4 - Notice of Validation. (01/2018) New child NOT 5 2023 is added
|
DocumentType |
Standard
|
Pages |
19
|
ProductNote |
NEW CHILD NOT 4 2018 IS NOW ADDED. New child NOT 5 2023 is added
|
PublisherName |
US Military Specs/Standards/Handbooks
|
Status |
Current
|
Supersedes |
This specification covers alloy steel forgings that are produced by a hot plastic deformation process such as hammering, pressing, upsetting, extruding or any combination of these processes. This specification includes the minimum essential Engineering and Packaging Requirements and the necessary Quality Assurance Provisions to determine that these requirements have been met.
ASTM E 340 : 2015 : REDLINE | Standard Practice for Macroetching Metals and Alloys |
ASTM E 381 : 2017 : REDLINE | Standard Method of Macroetch Testing Steel Bars, Billets, Blooms, and Forgings |
ASTM E 8 : 2004 | Standard Test Methods for Tension Testing of Metallic Materials |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.