• MIL-STD-1388-1 Revision A:1983

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    LOGISTIC SUPPORT ANALYSIS

    Available format(s):  PDF

    Superseded date:  30-05-1997

    Language(s): 

    Published date: 

    Publisher:  US Military Specs/Standards/Handbooks

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Paragraph
    1 Scope
    1.1 Purpose
    1.2 Application of standard
    1.2.1 Tailoring of task descriptions
    1.3 Method of reference
    1.4 Scope of performance
    1.5 Parts
    2 Referenced documents
    2.1 General
    3 Definitions
    3.1 General
    4 General requirements
    4.1 LSA program
    4.1.1 Program interfaces and coordination
    4.1.2 LSA process
    4.2 Quantitative requirements
    4.3 Management, surveillance, and control
    4.4 LSA documentation
    4.4.1 Logistic support analysis record format
    5 Task descriptions
    5.1 General
    5.1.1 Task structure
    5.2 Task section 100 - program planning and control
    5.2.1 Task 101 - development of an early logistic
           support analysis strategy
    5.2.2 Task 102 - logistic support analysis plan
    5.2.3 Task 103 - program and design reviews
    5.3 Task section 200 - mission and support systems
           definition
    5.3.1 Task 201 - use study
    5.3.2 Task 202 - mission hardware, software and support
           systems definition
    5.3.3 Task 203 - comparative analysis
    5.3.4 Task 204 - technological opportunities
    5.3.5 Task 205 - supportability and supportability
           related design factors
    5.4 Task section 300 - preparation and evaluation of
           alternatives
    5.4.1 Task 301 - function requirements identification
    5.4.2 Task 302 - support system alternatives
    5.4.3 Task 303 - evaluation of alternatives and tradeoff
           analysis
    5.5 Task 400 - determination of logistic support
           resource requirements
    5.5.1 Task 401 - task analysis
    5.5.2 Task 402 - early fielding analysis
    5.5.3 Task 403 - post production support analysis
    5.6 Task section 500 - supportability assessment
    5.6.1 Task 501 - supportability test, evaluation, and
           verification
    Figures
    1 Logistic support analysis process objectives by
        program phase
    2 Logistic support analysis process overview
    3 Logistic support analysis process flowchart
    3a Supportability standards information relationships
    4 System level logistic support analysis interfaces
    5 Logistic support analysis tailoring decision logic
    6 Provisioning performance schedule
    Table
    I Index of logistic support analysis tasks
    II Logistic support analysis information requirements
         for major systems by milestone
    III Logistic support analysis task application and
         documentation matrix
    Appendix A - Application guidance for implementation of
                 logistic support analysis program
                 requirements
    Paragraph
    10 Scope
    10.1 General
    10.2 How to use this appendix
    20 Referenced documents
    30 Definitions
    40 General application guidance for logistic
              support analysis programs
    40.1 LSA process
    40.1.1 Analysis of supportability
    40.1.2 Assessment and verification
    40.1.3 Interfaces
    40.1.3.1 Inputs and outputs for system level LSA
    40.1.3.2 Refinement and extension of the system level
              LSA
    40.1.3.3 Task analysis interfaces
    40.1.3.4 Resource requirements identification
    40.2 Major criteria
    40.2.1 Manpower and personnel constraints
    40.2.2 System readiness
    40.2.3 Cost
    40.3 Strategy in developing analysis requirements
    40.3.1 General
    40.3.2 Task selection and focusing
    40.3.2.1 General
    40.3.2.2 System readiness
    40.3.3 Factors impacting on strategy
    40.3.3.1 Type of program/change
    40.3.3.2 Amount of design freedom
    40.3.3.3 Time and resources available
    40.3.3.4 Work already done
    40.3.3.5 Past experience and historical data
    40.3.3.6 Procurement considerations
    40.4 Application in procurement
    40.4.1 Pre-RFP and bidders briefings
    40.4.2 Preparing LSA RFP requirements
    40.4.2.1 Broad versus specifics
    40.4.2.2 Interweave supportability requirements and
              constraints
    40.4.2.3 Relative importance of requirements
    40.4.2.4 Support related design drivers
    40.4.2.5 Alternative support concepts
    40.4.2.6 Evaluation methods and models
    40.5 Task documentation
    40.6 Supportability modeling
    50 Detailed guidance for task sections, tasks,
              and subtasks
    50.1 Task section 100 - program planning and
              control
    50.1.1 General considerations
    50.1.1.1 Program management
    50.1.1.2 Identifying analysis task requirements
    50.1.1.3 Timing
    50.1.1.4 Program execution
    50.1.2 Development of an early logistic support
              analysis strategy (task 101)
    50.1.3 Logistic support analysis plan (task 102)
    50.1.4 Program and design reviews (task 103)
    50.2 Task section 200 - mission and support systems
              definitions
    50.2.1 General considerations
    50.2.2 Use study (task 201)
    50.2.3 Mission hardware, software, and support system
              standardization (task 202)
    50.2.4 Comparative analysis (task 203)
    50.2.5 Technological opportunities (task 204)
    50.2.6 Supportability and supportability related
              design factors (task 205)
    50.3 Task section 300 - preparation and evaluation
              of alternatives
    50.3.1 General considerations
    50.3.1.1 Iterations
    50.3.1.2 Timing
    50.3.2 Functional requirements identification (task
              301)
    50.3.3 Support system alternatives (task 302)
    50.3.4 Evaluation of alternatives and tradeoff
              analysis (task 303)
    50.4 Task section 400 - determination of logistic
              support resource requirements
    50.4.1 General considerations
    50.4.2 Task analysis (task 401)
    50.4.3 Early fielding analysis (task 402)
    50.4.4 Post production support analysis (task 403)
    50.5 Task section 500 - supportability assessment
    50.5.1 General considerations
    50.5.1.1 Types of assessment
    50.5.1.2 Test and evaluation
    50.5.1.3 Test environment
    50.5.1.4 Post deployment assessments
    50.5.2 Supportability test, evaluation, and
              verification (task 501)
    Appendix B - Glossary

    Abstract - (Show below) - (Hide below)

    Covers performance of Logistic Support Analysis during life cycle of equipment and systems.

    General Product Information - (Show below) - (Hide below)

    Committee AREA ILSS
    Development Note Supersedes MIL STD 1561 (B) (09/2004)
    Document Type Standard
    Publisher US Military Specs/Standards/Handbooks
    Status Superseded
    Superseded By
    Supersedes

    Standards Referenced By This Book - (Show below) - (Hide below)

    DEFSTAN 00-60(PT20)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - INTEGRATED SUPPLY SUPPORT PROCEDURES (ISSP)
    MIL-HDBK-2165 Base Document:1995 TESTABILITY PROGRAM FOR SYSTEMS AND EQUIPMENTS
    MIL-HDBK-1785 Base Document:1995 SYSTEM SECURITY ENGINEERING PROGRAM MANAGEMENT REQUIREMENTS
    DEFSTAN 00-13/3(1994) : 1994 REQUIREMENTS FOR THE ACHIEVEMENT OF TESTABILITY IN ELECTRONIC AND ALLIED EQUIPMENT
    DEFSTAN 00-60(PT2)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - GUIDE TO THE APPLICATION OF LSA AND LSAR
    MIL-F-24291 Revision C:1990 FLOWMETER, FLUID ELECTROMAGNETIC TYPE
    MIL-HDBK-59 Revision B:1994 COMPUTER AIDED ACQUISITION AND LOGISTIC SUPPORT (CALS) PROGRAM IMPLEMENTATION GUIDE
    MIL STD 470 : B MAINTAINABILITY PROGRAM REQUIREMENTS (FOR SYSTEMS AND EQUIPMENTS)
    MIL-STD-1908 Base Document:1992 DEFINITION OF HUMAN FACTOR TERMS (METRIC)
    DEFSTAN 00-60(PT1)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR)
    MIL-HDBK-470 Revision A:1997 DESIGNING AND DEVELOPING MAINTAINABLE PRODUCTS AND SYSTEMS - VOLUME 1
    MIL-HDBK-284-3 Base Document:1992 INTERACTIVE COURSEWARE (ICW) FOR MILITARY TRAINING, GLOSSARY FOR
    MIL M 87268 : 1992 MANUALS, INTERACTIVE ELECTRONIC TECHNICAL - GENERAL CONTENT, STYLE, FORMAT & USER-INTERACTION REQUIREMENTS
    DEFSTAN 00-60(PT0)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
    SAE ARP 5638 : 2005 RMS TERMS AND DEFINITIONS
    MIL-HDBK-117 Base Document:1991 Motors, Electric, Small Acquisition, Operations and Support for Primer (No S/S Document)
    MIL-W-5088 Revision L:1991 Wiring, Aerospace Vehicle (Future Design Should Refer to SAE-AS50881)
    MIL-STD-2097 Revision A:1989 ACQUISITION OF SUPPORT EQUIPMENT AND ASSOCIATED INTEGRATED LOGISTICS SUPPORT
    DEFSTAN 21-59(PT2)/1(2005) : INTERIM SYSTEMS ENGINEERING GUIDE FOR NAVAL COMBAT SYSTEMS - PART 2: (SSP 59)
    MIL-STD-188-125 Revision A:1994 HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP) PROTECTION FOR GROUND-BASED C41 FACILITIES PERFORMING CRITICAL, TIME-URGENT MISSIONS - VOLUME 1 - FIXED FACILITIES (METRIC)
    MIL-STD-100 Revision G:1997 ENGINEERING DRAWINGS
    MIL-STD-973 Base Document:1992 CONFIGURATION MANAGEMENT
    MIL-HDBK-2097 Revision A:1997 ACQUISITION OF SUPPORT EQUIPMENT AND ASSOCIATED INTEGRATED LOGISTICS SUPPORT
    MIL-HDBK-87244 Base Document:1995 AVIONICS/ELECTRONICS INTEGRITY
    DOD-STD-1702 Base Document:1985 INTEGRATED LOGISTICS SUPPORT PROGRAMS FOR EQUIPMENT, SUBSYSTEMS AND SYSTEMS (METRIC)
    MIL-STD-1561 Revision B:1984 PROVISIONING PROCEDURES, UNIFORM DOD
    MIL-STD-1388-2 Revision B:1991 DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD
    MIL D 87269 : (1) DATA BASE, REVISABLE - INTERACTIVE ELECTRONIC TECHNICAL MANUALS, FOR THE SUPPORT OF
    DOD-HDBK-292-1 Base Document:1986 TRAINING MATERIALS DEVELOPMENT PART 1 OF 2
    SAE AIR 5121 : 2012 SOFTWARE SUPPORTABILITY - AN OVERVIEW
    MIL M 24784 : NOTICE 1 MANUALS, TECHNICAL: GENERAL ACQUISITION AND DEVELOPMENT REQUIREMENTS
    DOD-HDBK-791 Base Document:1988 MAINTAINABILITY DESIGN TECHNIQUES
    MIL-STD-1478 Base Document:1991 TASK PERFORMANCE ANALYSIS
    MIL STD 1843 : 0 RELIABILITY-CENTERED MAINTENANCE FOR AIRCRAFT, ENGINES AND EQUIPMENT
    MIL STD 1379 : D MILITARY TRAINING PROGRAMS
    PREN 9200 : 200P1 AEROSPACE SERIES - PROGRAMME MANAGEMENT - GUIDELINES FOR PROJECT MANAGEMENT SPECIFICATION
    BS EN 9200:2004 Programme management. Guidelines for project management specification
    EN 9200:2004 Aerospace series - Programme management - Guidelines for project management specification
    MIL-D-8708 Revision C:1991 DEMONSTRATION REQUIREMENTS FOR AIRPLANES
    DEFSTAN 00-41(PT6)/1(1989) : 1989 MOD PRACTICES AND PROCEDURES FOR RELIABILITY AND MAINTAINABILITY - PART 6: MAINTAINABILITY
    MIL-STD-1390 Revision D:1993 LEVEL OF REPAIR ANALYSIS (LORA)

    Standards Referencing This Book - (Show below) - (Hide below)

    MIL-STD-480 Revision B:1988 CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS
    MIL-STD-1388-2 Revision B:1991 DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD
    MIL-STD-1366 Revision E:2006 INTERFACE STANDARD FOR TRANSPORTABILITY CRITERIA
    MIL-H-46855 Revision B:1979 HUMAN ENGINEERING REQUIREMENTS FOR MILITARY SYSTEMS, EQUIPMENT & FACILITIES
    MIL-STD-1478 Base Document:1991 TASK PERFORMANCE ANALYSIS
    MIL-STD-1629 Revision A:1980 PROCEDURES FOR PERFORMING A FAILURE MODE, EFFECTS AND CRITICALITY ANALYSIS
    MIL T 31000 : 0 TECHNICAL DATA PACKAGES - GENERAL SPECIFICATION FOR
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective