• Shopping Cart
    There are no items in your cart

MIL-STD-1388-1 Revision A:1983

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

LOGISTIC SUPPORT ANALYSIS

Available format(s)

PDF

Superseded date

30-05-1997

Paragraph
1 Scope
1.1 Purpose
1.2 Application of standard
1.2.1 Tailoring of task descriptions
1.3 Method of reference
1.4 Scope of performance
1.5 Parts
2 Referenced documents
2.1 General
3 Definitions
3.1 General
4 General requirements
4.1 LSA program
4.1.1 Program interfaces and coordination
4.1.2 LSA process
4.2 Quantitative requirements
4.3 Management, surveillance, and control
4.4 LSA documentation
4.4.1 Logistic support analysis record format
5 Task descriptions
5.1 General
5.1.1 Task structure
5.2 Task section 100 - program planning and control
5.2.1 Task 101 - development of an early logistic
       support analysis strategy
5.2.2 Task 102 - logistic support analysis plan
5.2.3 Task 103 - program and design reviews
5.3 Task section 200 - mission and support systems
       definition
5.3.1 Task 201 - use study
5.3.2 Task 202 - mission hardware, software and support
       systems definition
5.3.3 Task 203 - comparative analysis
5.3.4 Task 204 - technological opportunities
5.3.5 Task 205 - supportability and supportability
       related design factors
5.4 Task section 300 - preparation and evaluation of
       alternatives
5.4.1 Task 301 - function requirements identification
5.4.2 Task 302 - support system alternatives
5.4.3 Task 303 - evaluation of alternatives and tradeoff
       analysis
5.5 Task 400 - determination of logistic support
       resource requirements
5.5.1 Task 401 - task analysis
5.5.2 Task 402 - early fielding analysis
5.5.3 Task 403 - post production support analysis
5.6 Task section 500 - supportability assessment
5.6.1 Task 501 - supportability test, evaluation, and
       verification
Figures
1 Logistic support analysis process objectives by
    program phase
2 Logistic support analysis process overview
3 Logistic support analysis process flowchart
3a Supportability standards information relationships
4 System level logistic support analysis interfaces
5 Logistic support analysis tailoring decision logic
6 Provisioning performance schedule
Table
I Index of logistic support analysis tasks
II Logistic support analysis information requirements
     for major systems by milestone
III Logistic support analysis task application and
     documentation matrix
Appendix A - Application guidance for implementation of
             logistic support analysis program
             requirements
Paragraph
10 Scope
10.1 General
10.2 How to use this appendix
20 Referenced documents
30 Definitions
40 General application guidance for logistic
          support analysis programs
40.1 LSA process
40.1.1 Analysis of supportability
40.1.2 Assessment and verification
40.1.3 Interfaces
40.1.3.1 Inputs and outputs for system level LSA
40.1.3.2 Refinement and extension of the system level
          LSA
40.1.3.3 Task analysis interfaces
40.1.3.4 Resource requirements identification
40.2 Major criteria
40.2.1 Manpower and personnel constraints
40.2.2 System readiness
40.2.3 Cost
40.3 Strategy in developing analysis requirements
40.3.1 General
40.3.2 Task selection and focusing
40.3.2.1 General
40.3.2.2 System readiness
40.3.3 Factors impacting on strategy
40.3.3.1 Type of program/change
40.3.3.2 Amount of design freedom
40.3.3.3 Time and resources available
40.3.3.4 Work already done
40.3.3.5 Past experience and historical data
40.3.3.6 Procurement considerations
40.4 Application in procurement
40.4.1 Pre-RFP and bidders briefings
40.4.2 Preparing LSA RFP requirements
40.4.2.1 Broad versus specifics
40.4.2.2 Interweave supportability requirements and
          constraints
40.4.2.3 Relative importance of requirements
40.4.2.4 Support related design drivers
40.4.2.5 Alternative support concepts
40.4.2.6 Evaluation methods and models
40.5 Task documentation
40.6 Supportability modeling
50 Detailed guidance for task sections, tasks,
          and subtasks
50.1 Task section 100 - program planning and
          control
50.1.1 General considerations
50.1.1.1 Program management
50.1.1.2 Identifying analysis task requirements
50.1.1.3 Timing
50.1.1.4 Program execution
50.1.2 Development of an early logistic support
          analysis strategy (task 101)
50.1.3 Logistic support analysis plan (task 102)
50.1.4 Program and design reviews (task 103)
50.2 Task section 200 - mission and support systems
          definitions
50.2.1 General considerations
50.2.2 Use study (task 201)
50.2.3 Mission hardware, software, and support system
          standardization (task 202)
50.2.4 Comparative analysis (task 203)
50.2.5 Technological opportunities (task 204)
50.2.6 Supportability and supportability related
          design factors (task 205)
50.3 Task section 300 - preparation and evaluation
          of alternatives
50.3.1 General considerations
50.3.1.1 Iterations
50.3.1.2 Timing
50.3.2 Functional requirements identification (task
          301)
50.3.3 Support system alternatives (task 302)
50.3.4 Evaluation of alternatives and tradeoff
          analysis (task 303)
50.4 Task section 400 - determination of logistic
          support resource requirements
50.4.1 General considerations
50.4.2 Task analysis (task 401)
50.4.3 Early fielding analysis (task 402)
50.4.4 Post production support analysis (task 403)
50.5 Task section 500 - supportability assessment
50.5.1 General considerations
50.5.1.1 Types of assessment
50.5.1.2 Test and evaluation
50.5.1.3 Test environment
50.5.1.4 Post deployment assessments
50.5.2 Supportability test, evaluation, and
          verification (task 501)
Appendix B - Glossary

Covers performance of Logistic Support Analysis during life cycle of equipment and systems.

Committee
AREA ILSS
DevelopmentNote
Supersedes MIL STD 1561 (B) (09/2004)
DocumentType
Standard
Pages
244
PublisherName
US Military Specs/Standards/Handbooks
Status
Superseded
SupersededBy
Supersedes

DEFSTAN 00-60(PT20)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - INTEGRATED SUPPLY SUPPORT PROCEDURES (ISSP)
MIL-HDBK-2165 Base Document:1995 Testability Program for Systems and Equipments
MIL-HDBK-1785 Base Document:1995 System Security Engineering Program Management Requirements
DEFSTAN 00-13/3(1994) : 1994 REQUIREMENTS FOR THE ACHIEVEMENT OF TESTABILITY IN ELECTRONIC AND ALLIED EQUIPMENT
DEFSTAN 00-60(PT2)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - GUIDE TO THE APPLICATION OF LSA AND LSAR
MIL-F-24291 Revision C:1990 FLOWMETER, FLUID ELECTROMAGNETIC TYPE
MIL-HDBK-59 Revision B:1994 COMPUTER AIDED ACQUISITION AND LOGISTIC SUPPORT (CALS) PROGRAM IMPLEMENTATION GUIDE
MIL STD 470 : B MAINTAINABILITY PROGRAM REQUIREMENTS (FOR SYSTEMS AND EQUIPMENTS)
MIL-STD-1908 Base Document:1992 DEFINITION OF HUMAN FACTOR TERMS (METRIC)
DEFSTAN 00-60(PT1)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - LOGISTIC SUPPORT ANALYSIS (LSA) AND LOGISTIC SUPPORT ANALYSIS RECORD (LSAR)
MIL-HDBK-470 Revision A:1997 Designing and Developing Maintainable Products and Systems, Volume I
MIL-HDBK-284-3 Base Document:1992 INTERACTIVE COURSEWARE (ICW) FOR MILITARY TRAINING, GLOSSARY FOR
MIL M 87268 : 1992 MANUALS, INTERACTIVE ELECTRONIC TECHNICAL - GENERAL CONTENT, STYLE, FORMAT & USER-INTERACTION REQUIREMENTS
DEFSTAN 00-60(PT0)/1(1994) : INTERIM INTEGRATED LOGISTIC SUPPORT - APPLICATION OF INTEGRATED LOGISTIC SUPPORT (ILS)
SAE ARP5638 RMS Terms and Definitions
MIL-HDBK-117 Base Document:1991 Motors, Electric, Small Acquisition, Operations and Support for Primer (No S/S Document)
MIL-W-5088 Revision L:1991 Wiring, Aerospace Vehicle (Future Design Should Refer to SAE-AS50881)
MIL-STD-2097 Revision A:1989 ACQUISITION OF SUPPORT EQUIPMENT AND ASSOCIATED INTEGRATED LOGISTICS SUPPORT
DEFSTAN 21-59(PT2)/1(2005) : INTERIM SYSTEMS ENGINEERING GUIDE FOR NAVAL COMBAT SYSTEMS - PART 2: (SSP 59)
MIL-STD-188-125 Revision A:1994 HIGH-ALTITUDE ELECTROMAGNETIC PULSE (HEMP) PROTECTION FOR GROUND-BASED C41 FACILITIES PERFORMING CRITICAL, TIME-URGENT MISSIONS - VOLUME 1 - FIXED FACILITIES (METRIC)
MIL-STD-100 Revision G:1997 ENGINEERING DRAWINGS
MIL-STD-973 Base Document:1992 CONFIGURATION MANAGEMENT
MIL-HDBK-2097 Revision A:1997 ACQUISITION OF SUPPORT EQUIPMENT AND ASSOCIATED INTEGRATED LOGISTICS SUPPORT
MIL-HDBK-87244 Base Document:1995 AVIONICS/ELECTRONICS INTEGRITY
DOD-STD-1702 Base Document:1985 INTEGRATED LOGISTICS SUPPORT PROGRAMS FOR EQUIPMENT, SUBSYSTEMS AND SYSTEMS (METRIC)
MIL-STD-1561 Revision B:1984 PROVISIONING PROCEDURES, UNIFORM DOD
MIL-STD-1388-2 Revision B:1991 DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD
MIL D 87269 : (1) DATA BASE, REVISABLE - INTERACTIVE ELECTRONIC TECHNICAL MANUALS, FOR THE SUPPORT OF
DOD-HDBK-292-1 Base Document:1986 TRAINING MATERIALS DEVELOPMENT PART 1 OF 2
SAE AIR5121A Software Supportability - An Overview
MIL M 24784 : NOTICE 1 MANUALS, TECHNICAL: GENERAL ACQUISITION AND DEVELOPMENT REQUIREMENTS
DOD-HDBK-791 Base Document:1988 MAINTAINABILITY DESIGN TECHNIQUES
MIL-STD-1478 Base Document:1991 TASK PERFORMANCE ANALYSIS
MIL STD 1843 : 0 RELIABILITY-CENTERED MAINTENANCE FOR AIRCRAFT, ENGINES AND EQUIPMENT
MIL STD 1379 : D MILITARY TRAINING PROGRAMS
PREN 9200 : 200P1 AEROSPACE SERIES - PROGRAMME MANAGEMENT - GUIDELINES FOR PROJECT MANAGEMENT SPECIFICATION
BS EN 9200:2004 Programme management. Guidelines for project management specification
EN 9200:2004 Aerospace series - Programme management - Guidelines for project management specification
MIL-D-8708 Revision C:1991 DEMONSTRATION REQUIREMENTS FOR AIRPLANES
DEFSTAN 00-41(PT6)/1(1989) : 1989 MOD PRACTICES AND PROCEDURES FOR RELIABILITY AND MAINTAINABILITY - PART 6: MAINTAINABILITY
MIL-STD-1390 Revision D:1993 LEVEL OF REPAIR ANALYSIS (LORA)

MIL-STD-480 Revision B:1988 CONFIGURATION CONTROL - ENGINEERING CHANGES, DEVIATIONS AND WAIVERS
MIL-STD-1388-2 Revision B:1991 DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD
MIL-STD-1366 Revision E:2006 INTERFACE STANDARD FOR TRANSPORTABILITY CRITERIA
MIL-H-46855 Revision B:1979 HUMAN ENGINEERING REQUIREMENTS FOR MILITARY SYSTEMS, EQUIPMENT & FACILITIES
MIL-STD-1478 Base Document:1991 TASK PERFORMANCE ANALYSIS
MIL-STD-1629 Revision A:1980 PROCEDURES FOR PERFORMING A FAILURE MODE, EFFECTS AND CRITICALITY ANALYSIS
MIL T 31000 : 0 TECHNICAL DATA PACKAGES - GENERAL SPECIFICATION FOR

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.