MIL-STD-2003 Revision B:2020
Current
The latest, up-to-date edition.
Electric Plant Installation Standard Methods for Surface Ships and Submarines
English
06-10-2020
DocumentType |
Standard
|
Pages |
8
|
PublisherName |
US Military Specs/Standards/Handbooks
|
Status |
Current
|
Supersedes |
This standard covers shipboard installation requirements for electrical cable, equipment, penetrations, cableways, and connectors. This standard consists of this general standard and five parts as follows: Part 1 (Cable) Preparation and end-sealing, entry to equipment and connectors, repair and splicing. ÂPart 2 (Equipment) Equipment mounting, switchboard mounting, battery equipment, casualty power, and shore power. ÂPart 3 (Penetrations) Swage tubes, stuffing tubes, kickpipes,Âmultiple cable penetrations; surface ships and submarines, hull penetration, and general. Part 4 (Cableways) General, submarine, surface ship and cable protection. Part 5 (Connectors) Cable and conductor preparation in accordance with MIL-C-81511/SAE AS81511, MIL-DTL-27599, MIL-DTL-22992, and MIL-DTL-38999 connectors.
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.