• Shopping Cart
    There are no items in your cart

MIL-STD-3021 Notice 1 - Validation:2019

Current

Current

The latest, up-to-date edition.

Materials Deposition, Cold Spray

Available format(s)

PDF

Language(s)

English

Published date

04-12-2019

Free

The procedures covered by this standard are intended to ensure that cold spray operations, either manual or automated, meet prescribed requirements.

DocumentType
Notice
Pages
1
PublisherName
US Military Specs/Standards/Handbooks
Status
Current

The procedures covered by this standard are intended to ensure that cold spray operations, either manual or automated, meet prescribed requirements. This standard ensures that cold spray operations are repeatable and consistent. However, additional qualification requirements may be required based on each specific application. Therefore, for structural applications and other applications that are considered critical - (safety critical or FOD critical), a qualification plan shall be provided by the Cognizant Engineering Authority (CEA) (see 3.13) and shall follow the recommendations specified in Appendix A and shall be specified in the contract or purchase order (see 6.2).

Free