NASA SP 3422 : 2011
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
NASA RISK MANAGEMENT HANDBOOK
15-06-2015
01-01-2011
Preface
1 INTRODUCTION
2 RIDM PROCESS INTERFACES
3 THE RIDM PROCESS
4 THE CRM PROCESS
5 REFERENCES
APPENDIX A - Acronyms and Abbreviations
APPENDIX B - Definitions
APPENDIX C - Content Guide for the Technical Basis for
Deliberation
APPENDIX D - Content Guide for the Risk-Informed
Selection Report
APPENDIX E - Selected NASA Examples of RIDM Process
Elements
APPENDIX F - Practical Aspects of the Risk Management Plan
APPENDIX G - Hypothetical Individual Risks Used for the
Planetary Science Example in the CRM Development
Specifies guidance for implementing the Risk Management (RM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements, with a specific focus on programs and projects, and applying to each level of the NASA organizational hierarchy as requirements flow down.
DocumentType |
Standard
|
PublisherName |
National Aeronautics and Space Administration
|
Status |
Superseded
|
SupersededBy |
NASA SP 3421 : 2011 | PROBABILISTIC RISK ASSESSMENT PROCEDURES GUIDE FOR NASA MANAGERS AND PRACTITIONERS |
NASA STD 8719.13 : 2013 | SOFTWARE SAFETY STANDARD |
NASA STD 7009 : 2016 | STANDARD FOR MODELS AND SIMULATIONS |
NASA SP 580 : 2011 | NASA SYSTEM SAFETY HANDBOOK - VOLUME 1, SYSTEM SAFETY FRAMEWORK AND CONCEPTS FOR SYSTEM SAFETY FRAMEWORK AND CONCEPTS FOR IMPLEMENTATION |
NASA STD 7009 : 2016 | STANDARD FOR MODELS AND SIMULATIONS |
NASA SP 569 : 2009 | BAYESIAN INFERENCE FOR NASA PROBABILISTIC RISK AND RELIABILITY ANALYSIS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.