• Shopping Cart
    There are no items in your cart

NASA SP 576 : 2010

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

RISK-INFORMED DECISION MAKING HANDBOOK

Withdrawn date

23-07-2013

Published date

01-01-2010

Sorry this product is not available in your region.

1. INTRODUCTION
2. RIDM PROCESS INTERFACES
3. THE RIDM PROCESS
4. SETTING THE STAGE FOR CRM
5. REFERENCES
APPENDIX A: NPR 8000.4A Requirements Cross-Reference
APPENDIX B: ACRONYMS AND ABBREVIATIONS
APPENDIX C: DEFINITIONS
APPENDIX D: Content Guide for the Technical Basis for
            Deliberation
APPENDIX E: Content Guide for the Risk-Informed Selection
            Report
APPENDIX F: Selected NASA Examples of RIDM Process Elements

Specifies guidance for implementing the risk-informed decision making (RIDM) requirements of NASA Procedural Requirements (NPR) document NPR 8000.4A, Agency Risk Management Procedural Requirements, with a specific focus on programs and projects in the Formulation phase, and applying to each level of the NASA organizational hierarchy as requirements flow down.

DocumentType
Standard
PublisherName
National Aeronautics and Space Administration
Status
Withdrawn

NASA SP 3421 : 2011 PROBABILISTIC RISK ASSESSMENT PROCEDURES GUIDE FOR NASA MANAGERS AND PRACTITIONERS
NASA MSFC HDBK 3684 : 2013 PROJECT PLANNING AND CONTROL HANDBOOK

NASA STD 7009 : 2016 STANDARD FOR MODELS AND SIMULATIONS
NASA SP 569 : 2009 BAYESIAN INFERENCE FOR NASA PROBABILISTIC RISK AND RELIABILITY ANALYSIS

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.