• Shopping Cart
    There are no items in your cart

NBN EN 50164-3 : 2006 AMD 1 2009

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

LIGHTNING PROTECTION COMPONENTS (LPC) - PART 3: REQUIREMENTS FOR ISOLATING SPARK GAPS

Superseded date

01-08-2012

Superseded by

NBN EN 62561-3 : 2012

Published date

12-01-2013

Sorry this product is not available in your region.

1 Scope
2 Normative references
3 Definitions
4 Classification
5 Requirements
  5.1 General
  5.2 Environmental requirements
  5.3 Installation instructions
  5.4 Lightning current carrying capability
  5.5 Rated impulse spark over voltage
  5.6 Rated withstand voltage
  5.7 Isolation resistance
  5.8 Marking
  5.9 UV resistance
6 Tests
  6.1 General
  6.2 Electrical test
  6.3 Marking test
7 Electromagnetic compatibility (EMC)
Annex A (normative) Conditioning of ISG's
Annex B (normative) Flow chart of tests

Describes the requirements and tests for isolating spark gaps (ISG) for lightning protection systems.

DocumentType
Standard
PublisherName
Belgian Standards
Status
Superseded
SupersededBy

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.