• Shopping Cart
    There are no items in your cart

NBN EN 60076-4 : 2003

Current

Current

The latest, up-to-date edition.

POWER TRANSFORMERS - PART 4: GUIDE TO THE LIGHTNING IMPULSE AND SWITCHING IMPULSE TESTING - POWER TRANSFORMERS AND REACTORS

Published date

12-01-2013

Sorry this product is not available in your region.

1 Scope
2 Normative references
3 General
4 Specified waveshapes
5 Test circuit
6 Calibration
7 Lightning impulse tests
   7.1 Waveshapes
   7.2 Impulses chopped on the tail
   7.3 Terminal connections and applicable methods of
        failure detection
   7.4 Test procedures
   7.5 Recording of tests
8 Switching impulse tests
   8.1 Special requirements
   8.2 Transformers
   8.3 Reactors
9 Interpretation of oscillograms or digital recordings
   9.1 Lightning impulse
   9.2 Switching impulse
1O Digital processing, including transfer function analysis
11 Impulse test reports
Annex A (informative) Principles of waveshape control
Annex B (informative) Typical oscillograms and digital
        recordings
Annex ZA (normative) Normative references to international
         publications with their corresponding European
         publications
Figures
Table B.1

Provides guidance and explanatory comments on the existing procedures for lightning and switching impulse testing of power transformers to supplement the requirements of IEC 60076-3.

DocumentType
Standard
PublisherName
Belgian Standards
Status
Current

Standards Relationship
BS EN 60076-4:2002 Identical
DIN EN 60076-4 : 2003 Identical
EN 60076-4:2002 Identical
I.S. EN 60076-4:2002 Identical
UNE-EN 60076-4:2005 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.