• NEN EN 12050-1 : 2015

    Current The latest, up-to-date edition.

    WASTEWATER LIFTING PLANTS FOR BUILDINGS AND SITES - PART 1: LIFTING PLANTS FOR WASTEWATER CONTAINING FAECAL MATTER

    Available format(s): 

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Netherlands Standards

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Requirements
        4.1 Control equipment
        4.2 Collection tank for wastewater containing
               faecal matter
        4.3 Manufacturer's statement
    5 Construction principles
        5.1 Pumping of solids
        5.2 Pipe connections
        5.3 Minimum dimensions of vertilating pipework
        5.4 Minimum flow velocity
        5.5 Minimum passage of the part
        5.6 Minimum size of discharge pipework for
             non-macerating faecal lifting plants
        5.7 Minimum size of discharge pipework for
             macerating faecal lifting plants
        5.8 Electrical equipment
        5.9 Fixing devices
    6 Materials
    7 Testing documentation and samples to be tested
    8 Testing
         8.1 General
         8.2 Test conditions
         8.3 Testing for leaks
         8.4 Lifting effectiveness of the faecal lifting
              plant
         8.5 Test procedure
         8.6 Macerating faecal lifting plants
    9 Conformity evaluation
         9.1 General requirements
         9.2 Initial testing of the products (type testing)
         9.3 Factory production control (FPC) carried out
              by the manufacturer (internal conformity
              evaluation)
         9.4 Non-conforming products
    10 Marking
    11 Installation, operation and maintenance
    Annex A (normative)
                Additional requirements
    Annex B (informative)
                Recommended materials
    Annex C (informative)
                Conformity evaluation by an independent third
                party
                (third party evaluation)
    Annex Z (informative)
                Links with the EU Construction Products
                Directive(89/106)
    Bibliography

    Abstract - (Show below) - (Hide below)

    Describes lifting plants for wastewater containing faecal lifting plants which may also be used to deal with wastewater that does not contain faecal matter, for drainage of locations in buildings and sites below flood level for buildings and sites to prevent any backflow of wastewater into the building. Also specifies general requirements, basic construction and testing principles, together with information on materials and conformity evaluation.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher Netherlands Standards
    Status Current
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective