• Shopping Cart
    There are no items in your cart

NEN EN 12952-7 : 2012

Current

Current

The latest, up-to-date edition.

WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 7: REQUIREMENTS FOR EQUIPMENT FOR THE BOILER

Published date

12-01-2013

Sorry this product is not available in your region.

1 Scope
2 Normative references
3 Terms and definitions
  3.1 Types of steam boilers and hot water generators
  3.2 Limits of steam boilers and hot water generators
  3.3 Steam boilers and hot water generating plant
  3.4 Heat supply system
  3.5 Classification of pressure generation systems (Hot
       water generators)
  3.6 Expansion system (vessel and tank)
  3.7 Sinking time
  3.8 Maximum continuous rating (MCR)
  3.9 Allowable heat output
  3.10 Maximum allowable pressure
  3.11 Allowable flow temperature
  3.12 Controls
  3.13 Limiters
  3.14 Fail-safe
  3.15 Self-monitoring
  3.16 Redundancy
  3.17 Independent
  3.18 Reliability
  3.19 Lock-out
  3.20 Unit test
  3.21 Functional test
  3.22 Permanent supervision
4 General requirements for steam boilers and hot water
  generators
  4.1 Safeguards against excessive pressure
  4.2 Heat supply system
  4.3 Ash removal plants
  4.4 Flue-gas cleaning plants
  4.5 Requirements for limiting devices and safety circuits
  4.6 Cleaning, access and inspection openings
  4.7 Feed lines and protection against feedwater backflow
  4.8 Connection of steam boilers or hot water generators
5 Special requirements for steam boilers
  5.1 Requirements for pumps
  5.2 Isolating and drain devices
  5.3 Lowest permissible water level (LWL)
  5.4 Water level and flow indicators
  5.5 Water supply control and protective device against
       water shortage
  5.6 Pressure and temperature measuring devices
5.7 Marking
6 Special requirements for hot water generators
  6.1 Requirements for hot water generating systems
  6.2 Requirements for pumps
  6.3 Shut-off and drain devices
  6.4 Lowest permissible water level and installation of
       flow and return line
  6.5 Water level and flow indicators
  6.6 Water supply and drain control, protective device
       against water shortage
  6.7 Safeguards against minimum pressure
  6.8 Safety device for temperature control
  6.9 Pressure and temperature indicating devices
  6.10 Marking
7 Additional requirements for plants without permanent
  supervision
  7.1 General
  7.2 Steam boilers
  7.3 Hot water generators
8 Final assessment of safety devices
  8.1 Performance of inspection
  8.2 Equipment on the steam and water side
  8.3 Firing system equipment
  8.4 Electrical safety circuit
  8.5 Operating instructions
9 Small plant boilers
  9.1 Steam boilers
  9.2 Hot water generators
Annex A (normative) Chemical recovery boilers (Black liquor
         recovery boilers)
Annex B (informative) Design examples for hot water generating
         systems
Annex ZA (informative) Clauses of this European Standard
         addressing essential requirements or other provisions
         of the Pressure Equipment Directive

Defines the essential requirements for equipment and protective devices for a water-tube boiler plant as defined in EN 12952-1, to ensure the boiler operates safely within the allowable limits (pressure, temperature, etc.).

DocumentType
Standard
PublisherName
Netherlands Standards
Status
Current

Standards Relationship
BS EN 12952-7:2002 Identical
DIN EN 12952-7:2013-01 Identical
EN 12952-7:2012 Identical
I.S. EN 12952-7:2012 Identical
UNI EN 12952-7 : 2013 Identical
UNE-EN 12952-7:2014 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.