• NEN EN IEC 60965 : 2016

    Current The latest, up-to-date edition.

    NUCLEAR POWER PLANTS - CONTROL ROOMS - SUPPLEMENTARY CONTROL ROOM FOR REACTOR SHUTDOWN WITHOUT ACCESS TO THE MAIN CONTROL ROOM

    Available format(s): 

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Netherlands Standards

    Sorry this product is not available in your region.

    Add To Cart

    Abstract - (Show below) - (Hide below)

    Defines requirements for the Supplementary Control Room provided to enable the operating staff of nuclear power plants to shut down the reactor, where previously operating, and maintain the plant in a safe shut-down state in the event that control of the safety functions can no longer be exercised from the Main Control Room, due to unavailability of the Main Control Room or its facilities.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher Netherlands Standards
    Status Current
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective