• Shopping Cart
    There are no items in your cart

NEN EN ISO 13679 : 2006

Withdrawn

Withdrawn

A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.

View Superseded by

PETROLEUM AND NATURAL GAS INDUSTRIES - PROCEDURES FOR TESTING CASING AND TUBING CONNECTIONS

Withdrawn date

01-09-2019

Superseded by

NEN-EN-ISO 13679:2019

Published date

12-01-2013

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Terms, definitions, symbols and abbreviated terms
   3.1 Terms and definitions
   3.2 Symbols and abbreviated terms
4 General requirements
   4.1 Connection geometry, test load envelope and performance
        data sheet
   4.2 Quality control
5 General test requirements
   5.1 Test classes
   5.2 Test matrix
   5.3 Test programme
   5.4 Calibration and accreditation requirements
   5.5 Rehearsal tests
   5.6 Material property tests
   5.7 Make-up and break-out procedures
   5.8 Internal pressure leak detection
   5.9 Internal pressure leak trap device
   5.10 External pressure leak detection
   5.11 Data acquisition and test methods
   5.12 Thermal cycling tests
6 Connection test specimen preparation
   6.1 General connection test objectives
   6.2 Connection test specimen identification and marking
   6.3 Connection test specimen preparation
   6.4 Connection test specimen machining
   6.5 Machining tolerances
   6.6 Tolerance limits on machining objectives
   6.7 Grooved torque shoulder
7 Test procedures
   7.1 Principle
   7.2 Make-up/break-out tests
   7.3 Test load envelope tests
   7.4 Limit load tests
   7.5 Limit load test path
8 Acceptance criteria
   8.1 Make-up and break-out tests
   8.2 Test load envelope tests
   8.3 Limit load tests
9 Test reports
Annex A (normative) Connection geometry and performance data sheet
Annex B (informative) Connection test load envelope and limit loads
Annex C (normative) Data forms
Annex D (normative) Connection full test report
Annex E (normative) Connection testing summary report
Annex F (informative) Frame load range determination
Annex G (informative) Interpolation and extrapolation considerations
Annex H (informative) Special application testing
Annex I (informative) Rationale for design basis
Annex J (normative) Independent seal testing of connections with
                    metal-to-metal and resilient seals
Bibliography

Defines minimum design verification testing procedures and acceptance criteria for casing and tubing connections for the oil and natural gas industries.

DevelopmentNote
Supersedes NEN ISO 13679. (12/2006) Draft issued in September 2010. (09/2010)
DocumentType
Standard
PublisherName
Netherlands Standards
Status
Withdrawn
SupersededBy
Supersedes

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.