• NEN NPR CLC/TS 50549-2 : 2015

    Current The latest, up-to-date edition.

    REQUIREMENTS FOR GENERATING PLANTS TO BE CONNECTED IN PARALLEL WITH DISTRIBUTION NETWORKS - PART 2: CONNECTION TO A MV DISTRIBUTION NETWORK

    Available format(s): 

    Language(s): 

    Published date:  03-03-2015

    Publisher:  Netherlands Standards

    Sorry this product is not available in your region.

    Add To Cart

    Abstract - (Show below) - (Hide below)

    Defines technical guidance on the requirements for generating plants which can be operated in parallel with a distribution network.

    General Product Information - (Show below) - (Hide below)

    Document Type Standard
    Publisher Netherlands Standards
    Status Current
    Superseded By
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective