• Shopping Cart
    There are no items in your cart

NFP 98 701 : 1993

Current

Current

The latest, up-to-date edition.

ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - MATERIAL PROCESSING PLANTS - TERMINOLOGY AND PERFORMANCES

Published date

12-01-2013

Sorry this product is not available in your region.

DevelopmentNote
Indice de classement: P98-701. (06/2014)
DocumentType
Standard
PublisherName
Association Francaise de Normalisation
Status
Current

NFP 98 744-3 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 3: AGGREGATE VOLUMETRIC DOSING MACHINE
NFP 98 728-2 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - HOT MIX ASPHALT PRODUCTION FACILITIES - DEFINITION OF CONSTITUENT EQUIPMENT AND CHARACTERISTICS, VERIFICATION OF INITIAL SETTINGS - PART 2 : BITUMINOUS MIXTURE DISCONTINUOUS MODE PRODUCTION FACILITIES
NFP 98 744-7 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 7: POWDER WEIGHING DOSING MACHINE WITH TOTAL WEIGHED SCREW - SUBSTANCE WEIGHING TEST
XP P98 772-2 : 2004 XP ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULES FOR GRANULAR MIX FABRICATION PLANTS - DESCRIPTION AND FUNCTIONAL SPECIFICATIONS - PART 2: DISCONTINUOUS PRODUCTION MODULE
NFP 98 732-1 : 2001 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - MANUFACTURE OF MIXTURES AND QUALITY CONTROL - PART 1: MIXING PLANTS FOR HYDRAULIC BINDER TREATED OR UNTREATED MATERIALS
NFP 98 772-2 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULE FOR GRANULAR MIXTURE PRODUCTION PLANTS - DESCRIPTION AND FUNCTIONAL REQUIREMENTS - PART 2: MODULE FOR DISCONTINUOUS PRODUCTION
NFP 98 772-1 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - DATA ACQUISITION MODULE FOR GRANULAR MIXTURE PRODUCTION PLANTS - DESCRIPTION AND FUNCTIONAL REQUIREMENTS - PART 1: MODULE FOR CONTINUOUS PRODUCTION
NFP 98 744-1 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 1: BELT FLOW METER FOR BELT CONVEYOR
NFP 98 744-2 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 2: AGGREGATE WEIGHING DOSING MACHINE
00/100818 DC : DRAFT FEB 2000 BS ISO 15642 - ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ASPHALT MIXING PLANTS - TERMINOLOGY AND COMMERCIAL SPECIFICATIONS
XP P98 142-1 : 2003 XP ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - MANUFACTURE OF MIXTURES - PART 1: PRODUCTION CONTROL OF HOT MIX ASPHALTS USING A DATA ACQUISITION SYSTEM
NFP 98 744-4 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 4: DRY BULK WEIGHING DOSING MACHINE - BELT SAMPLING TEST
NFP 98 744-5 : 2009 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - ON-SITE CALIBRATION AND VERIFICATION OF THE SETTINGS OF CONTINUOUS DOSING APPARATUS OF MATERIAL PRODUCTION PLANTS - PART 5: DRY BULK WEIGHING DOSING MACHINE - SUBSTANCE WEIGHING TEST
NFP 98 728-1 : 2013 ROAD CONSTRUCTION AND MAINTENANCE EQUIPMENT - HOT MIX ASPHALT PRODUCTION FACILITIES - DEFINITION OF CONSTITUENT EQUIPMENT AND CHARACTERISTICS, VERIFICATION OF INITIAL SETTINGS - PART 1: BITUMINOUS MIXTURE CONTINUOUS MODE PRODUCTION FACILITIES
NFP 98 115 : 2009 ROAD FOUNDATIONS - CONSTRUCTION OF PAVEMENT STRUCTURES - COMPONENTS - MIX COMPONENTS AND FORMULAE - PERFORMANCE AND CONTROL

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.