• There are no items in your cart

NS EN 1076 : 2009

Current

Current

The latest, up-to-date edition.

WORKPLACE EXPOSURE - PROCEDURES FOR MEASURING GASES AND VAPOURS USING PUMPED SAMPLERS - REQUIREMENTS AND TEST METHODS

Published date

12-01-2013

Sorry this product is not available in your region.

Foreword
Introduction
1 Scope
2 Normative references
3 Definitions
4 Symbols and abbreviations
5 Requirements
6 General test conditions
7 Test methods
8 Levels of evaluation
9 Test report
10 Marking
Annexes
A (informative) Examples for the determination of the
breakthrough volume
B (normative) Analysis of experimental data (two-factor
experiment)
C (informative) Field tests - Paired comparisons
D (informative) Field tests - Multiple comparisons
E (normative) Environmental influences - Multifactor test
F (informative) Typical tube dimensions
G (informative) Bibliography

Describes performance requirements and test methods under prescribed laboratory conditions for a pumped sorbent tube used in conjunction with an air sampling pump for the determination of gases and vapours in workplace atmospheres.

DocumentType
Standard
PublisherName
Norwegian Standards (Norges Standardiseringsforbund)
Status
Current
SupersededBy

Standards Relationship
I.S. EN 1076:2009 Identical
DIN EN 1076:2010-04 Identical
EN 1076:2009 Identical
UNI EN 1076 : 2010 Identical
UNE-EN 1076:2010 Identical
BS EN 1076:2009 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.