ONORM EN 12952-5 : 2011
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
View Superseded by
WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 5: WORKMANSHIP AND CONSTRUCTION OF PRESSURE PARTS OF THE BOILER
15-02-2022
12-01-2013
Foreword
1 Scope
2 Normative references
3 Definitions
4 Symbols and abbreviations
5 General
6 Pressure parts
6.1 Drums, headers and similar pressure parts
6.2 Material identification
6.3 Material marking
6.4 Marking during manufacture
7 Cutting, forming and fabrication tolerances
7.1 Cutting of material
7.2 Forming of drums, headers and ends
7.3 Forming of tube bends
7.4 Drum and header fabrication tolerances
8 Welding
8.1 Design and other requirements specific to welding
8.2 Welding consumables
8.3 Welding approvals
8.4 General production requirements for welding
8.5 Repairs to welds
8.6 Pre-heating
8.7 Post-weld heat treatment
8.8 Welding subsequent to final post-weld heat treatment
8.9 Welded joints, connections and production test
plates
8.10 Attachment of non-pressure parts to drums and
headers by welding
8.11 Welding of tubes
8.12 Flash butt welding of tubes
8.13 Welded tube water walls
8.14 Arc stud welding
9 Mechanical connections
9.1 General
9.2 Access openings
9.3 Branches and nozzles mechanically connected to
the main pressure parts
9.4 Tube connections
9.5 The connection of non-pressure parts to pressure parts
10 Thermal treatment
10.1 General
10.2 Heating cycles and heat treatment(s) associated
with plate forming operations
10.3 Pre-heating for welding and thermal cutting
10.4 Post-weld heat treatment
10.5 Heat treatment of production test plates
Annex A (normative) Tube bending procedure tests
A.1 General
A.2 Hot or cold formed bends in tubes with
outside diameter less than or equal to 142 mm
A.3 Cold formed bends in tubes with outside
diameter > 142 mm
A.4 Hot formed bends in tubes with outside
diameter > 142 mm
Annex B (informative) Welded pressure connections and
non-pressure containing attachments
Annex C (normative) Manufacture of welded tubewalls
C.1 General
C.2 Methods of manufacture
C.3 Allowable materials
C.4 Manufacturing processes and controls
C.5 Welding procedure approvals
C.6 Production tests
C.7 Non destructive examination (NDE)
Annex D (normative) Coiled boilers and coiled superheaters
D.1 General
D.2 Special requirements
Annex E (normative) Chemical recovery boilers
E.1 General
E.2 Definition
E.3 Special requirements for forming of composite
tube bends
E.4 Special requirements for manufacture of
welded tube walls from composite tubes
E.5 Material marking
E.6 Flash butt welding
Annex F (informative) Guidelines for the determination of
the competency of boiler manufacturers
F.1 General
F.2 Responsibility of the user
F.3 Responsibility of the manufacturer
F.4 Requirements concerning manufacturer's competency
F.5 Manufacturer's competency declaration
Annex ZA (informative) Clauses of this European Standard
addressing essential safety requirements or other
provisions of the Pressure Equipment Directive
Bibliography
Gives requirements for the workmanship and construction of water-tube boilers as defined in EN 12952-1.
Committee |
TC 007
|
DocumentType |
Standard
|
PublisherName |
Osterreichisches Normungsinstitut/Austrian Standards
|
Status |
Withdrawn
|
SupersededBy |
Standards | Relationship |
I.S. EN 12952-5:2011 | Identical |
NF EN 12952-5 : 2011 | Identical |
UNI EN 12952-5 : 2011 | Identical |
BS EN 12952-5:2011 | Identical |
SN EN 12952-5 : 2012 | Identical |
NEN EN 12952-5 : 2011 | Identical |
NS EN 12952-5 : 2011 | Identical |
UNE-EN 12952-5:2012 | Identical |
DIN EN 12952-5:2012-01 | Identical |
NBN EN 12952-5 : 2011 | Identical |
EN 12952-5:2011 | Identical |
ONORM EN 12952-3 : 2012 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 3: DESIGN AND CALCULATION FOR PRESSURE PARTS OF THE BOILER |
ONORM EN 12952-2 : 2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 2: MATERIALS FOR PRESSURE PARTS OF BOILERS AND ACCESSORIES |
ONORM EN 12952-6 : 2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 6: INSPECTION DURING CONSTRUCTION, DOCUMENTATION AND MARKING OF PRESSURE PARTS OF THE BOILER |
ONORM EN 12952-6 : 2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 6: INSPECTION DURING CONSTRUCTION, DOCUMENTATION AND MARKING OF PRESSURE PARTS OF THE BOILER |
ONORM EN 12952-3 : 2012 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 3: DESIGN AND CALCULATION FOR PRESSURE PARTS OF THE BOILER |
ONORM EN 12952-2 : 2011 | WATER-TUBE BOILERS AND AUXILIARY INSTALLATIONS - PART 2: MATERIALS FOR PRESSURE PARTS OF BOILERS AND ACCESSORIES |
ISO 148-1:2016 | Metallic materials — Charpy pendulum impact test — Part 1: Test method |
ONORM EN 10253-2 : 2008 | BUTT-WELDING PIPE FITTINGS - PART 2: NON ALLOY AND FERRITIC ALLOY STEELS WITH SPECIFIC INSPECTION REQUIREMENTS |
ONORM EN 1092-1 : JUL 2014 | FLANGES AND THEIR JOINTS - CIRCULAR FLANGES FOR PIPES, VALVES, FITTINGS AND ACCESSORIES, PN DESIGNATED - PART 1: STEEL FLANGES |
ONORM EN 10025-2 : 2005 | HOT ROLLED PRODUCTS OF STRUCTURAL STEELS - PART 2: TECHNICAL DELIVERY CONDITIONS FOR NON-ALLOY STRUCTURAL STEELS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.