ONORM EN 1366-10 : 2011
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
FIRE RESISTANCE TESTS FOR SERVICE INSTALLATIONS - PART 10: SMOKE CONTROL DAMPERS
Published date
12-01-2013
Superseded date
23-02-2023
Superseded by
Sorry this product is not available in your region.
| DocumentType |
Standard
|
| PublisherName |
Osterreichisches Normungsinstitut/Austrian Standards
|
| Status |
Superseded
|
| SupersededBy |
| Standards | Relationship |
| EN 1366-10:2011+A1:2017 | Identical |
| ISO 5167-3:2003 | Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 3: Nozzles and Venturi nozzles |
| ONORM EN 1363-1 : 2012 | FIRE RESISTANCE TESTS - PART 1: GENERAL REQUIREMENTS |
| ONORM EN ISO 5167-3 : 2003 | MEASUREMENT OF FLUID FLOW BY MEANS OF PRESSURE DIFFERENTIAL DEVICES INSERTED IN CIRCULAR CROSS-SECTION CONDUITS RUNNING FULL - PART 3: NOZZLES AND VENTURI NOZZLES |
| ISO 13943:2017 | Fire safety — Vocabulary |
| ISO 5167-4:2003 | Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 4: Venturi tubes |
| ONORM EN 1366-9 : 2008 | FIRE RESISTANCE TESTS FOR SERVICE INSTALLATIONS - PART 9: SINGLE COMPARTMENT SMOKE EXTRACTION DUCTS |
| ONORM EN ISO 5167-4 : 2003 | MEASUREMENT OF FLUID FLOW BY MEANS OF PRESSURE DIFFERENTIAL DEVICES INSERTED IN CIRUCLAR CROSS-SECTION CONDUITS RUNNING FULL - PART 4: VENTURI TUBES |
| ISO 5167-2:2003 | Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 2: Orifice plates |
| ONORM EN 1366-8 : 2004 | FIRE RESISTANCE TESTS FOR SERVICE INSTALLATIONS - PART 8: SMOKE EXTRACTION DUCTS |
| ISO 5167-1:2003 | Measurement of fluid flow by means of pressure differential devices inserted in circular cross-section conduits running full — Part 1: General principles and requirements |
| ONORM EN ISO 5167-1 : 2003 | MEASUREMENT OF FLUID FLOW BY MEANS OF PRESSURE DIFFERENTIAL DEVICES INSERTED IN CIRCULAR CROSS-SECTION CONDUITS RUNNING FULL - PART 1: GENERAL PRINCIPLES AND REQUIREMENTS |
| ONORM EN ISO 5167-2 : 2003 | MEASUREMENT OF FLUID FLOW BY MEANS OF PRESSURE DIFFERENTIAL DEVICES INSERTED IN CIRCULAR CROSS-SECTION CONDUITS RUNNING FULL - PART 2: ORIFICE PLATES |
| ONORM EN 1751 : JUN 2014 | VENTILATION FOR BUILDINGS - AIR TERMINAL DEVICES - AERODYNAMIC TESTING OF DAMPER AND VALVES |
Summarise
Access your standards online with a subscription
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.
Sorry this product is not available in your region.