OVE EN IEC 61280-4-1:2020 08 01
Superseded
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
Fibre-optic communication subsystem test procedures – Part 4-1: Installed cabling plant – Multimode attenuation measurement (IEC 61280-4-1:2019)
Amended by
Available format(s)
Hardcopy
Language(s)
German - English, English
Published date
01-08-2020
Superseded date
08-05-2024
Superseded by
€145.50
Excluding VAT
This part of IEC 61280 is applicable to the measurement of attenuation of installed optical fibre cabling plant using multimode optical fibre.
| Committee |
IEC/TC 86
|
| DevelopmentNote |
NEW CHILD AC 2020 IS NOW ADDED
|
| DocumentType |
Standard
|
| Pages |
0
|
| ProductNote |
NEW CHILD AC 2020 IS NOW ADDED
|
| PublisherName |
Osterreichisches Normungsinstitut/Austrian Standards
|
| Status |
Superseded
|
| SupersededBy | |
| Supersedes |
| Standards | Relationship |
| EN IEC 61280-4-1:2019/AC:2020-05 | Identical |
| IEC 61280-4-1:2019 | Identical |
Summarise