PD 6580-2:1995
Current
The latest, up-to-date edition.
Home and building electronic systems. Technical report 1 Guidelines for the professional installation of Twisted Pair cables class 1
Hardcopy , PDF
English
15-08-1995
Committees responsible
National foreword
1. Introduction
2. Planning aspects
2.1 Different types of buildings
2.1.1 Home and buildings
2.1.2 Home
2.1.3 Buildings
2.1.4 Existing buildings
2.1.5 New buildings
2.1.6 Type of occupancy
2.2 Physical topology
2.3 Planning methodology
2.4 Environmental conditions and EMC
2.4.1 General requirements
2.4.2 Lightning protection
2.4.3 Use of earthing
2.4.4 Overvoltage protection
2.5 Electrical safety
2.5.1 General requirements
2.5.2 Power segregation
2.5.3 Bonding and connection of the screen
2.5.4 Installation using ducts and pipes
2.5.5 Installation in special locations
2.5.6 Protection of the TP Network cable against
overcurrents
2.6 Installation equipment
2.6.1 Cables and use
2.6.2 Boxes and distribution boards
2.6.3 TP Network termination
2.7 Extensions
3. Electrical installation
3.1 Physical installation
3.2 Wiring testing
3.3 System commissioning
3.3.1 General requirements
3.3.2 Examples of testing procedures
3.4 Documentation
3.4.1 Introduction
3.4.2 Documentation step by step
3.4.3 Format of documentation
4. Competence and training of the installer
Annex A (normative) Normative references
A.1 Publications explicitly referred to in this report
A.2 Other relevant standards
Provides a Technical Report that gives installation guidelines for the professional installation of Twisted Pair Home and Building Electronic Systems (TP HBES). Has been written for communication Class 1 systems; likely to be used for Class 2 systems.
| Committee |
IST/6/-/12
|
| DevelopmentNote |
Also numbered as R105-002. (08/2005)
|
| DocumentType |
Standard
|
| Pages |
28
|
| PublisherName |
British Standards Institution
|
| Status |
Current
|