PD 6638:1999
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
PNO-ISC specification number 003. C7 interconnect signalling connection control part (SCCP)
Hardcopy , PDF
15-12-2000
English
15-01-1999
0.2 Normative information
0.3 Contents
0.4 History
0.5 Issue Control
0.6 References
0.7 Glossary of terms
0.7.1 Abbreviations
0.7.2 Definitions
0.8 Scope
0.9 Treatment Of Items 'Not Required' or 'Shall Not Be Sent'
1 FUNCTIONAL DESCRIPTION OF THE SCCP
2 DEFINITION AND FUNCTION OF SCCP MESSAGES
3 SCCP FORMATS AND CODES
4 SCCP PROCEDURES
5 SCCP PERFORMANCE
Defines requirements of the Signalling Connection Control Part, standardized to be used across a UK national interconnect between Public Networks.
Committee |
TCT/001
|
DocumentType |
Standard
|
Pages |
14
|
PublisherName |
British Standards Institution
|
Status |
Superseded
|
SupersededBy |
PD 6627:2001 | PNO-ISC Information document number 007. UK Interconnect user of SCCP and MTP |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.