PD IEC/TR 61375-2-7:2014
Current
The latest, up-to-date edition.
Electronic railway equipment. Train communication network (TCN) Wireless Train Backbone (WLTB)
Hardcopy , PDF
English
30-04-2014
FOREWORD
INTRODUCTION
1 Scope
2 Terms, definitions and abbreviations
3 Architecture
4 Physical layer
5 Data link layer
6 Application layer
7 WLTB inauguration
8 Process data communication
9 Distributed power operation application
Annex A (informative) - Nation code specification
Bibliography
Specifies the protocols stack of a radio based Wireless Train Backbone which is used in distributed power freight trains.
Committee |
GEL/9/-/4
|
DocumentType |
Standard
|
Pages |
36
|
PublisherName |
British Standards Institution
|
Status |
Current
|
This part of IEC61375 describes the protocols stack of a radio based Wireless Train Backbone which is used in distributed power freight trains. This part provides information on the physical layer, the data link layer, the application layer and distributed power application.
The automatic inauguration of the radio based Wireless Train Backbone is not considered in this technical report.
Standards | Relationship |
IEC TR 61375-2-7:2014 | Identical |
UIC 557 : 3ED 2015 | DIAGNOSTICS ON PASSENGER ROLLING STOCK |
UIC 647 : 1ED 2006 | FUNCTIONAL MODEL FOR THE REMOTE CONTROL OF TRACTION UNITS |
UIC 556 : 5ED 2009 | INFORMATION TRANSMISSION IN THE TRAIN (TRAIN-BUS) |
UIC 541-4 : 4ED 2010 | BRAKES - BRAKES WITH COMPOSITION BRAKE BLOCKS - GENERAL CONDITIONS FOR CERTIFICATION OF COMPOSITE BRAKE BLOCKS |
UIC 541-3 : 8ED 2017 | BRAKES - DISC BRAKES AND THEIR APPLICATION - GENERAL CONDITIONS FOR THE APPROVAL OF BRAKE PADS |
UIC 541-2 : 1981 AMD 2 | DIMENSIONS OF HOSE CONNECTIONS (BRAKE HOSES) AND ELECTRIC CABLES; TYPES OF PNEUMATIC AND ELECTRIC CONNECTIONS AND THEIR POSITIONING ON WAGONS AND COACHES EQUIPPED WITH AUTOMATIC COUPLERS OF THE UIC AND OSJD MEMBER RAILWAYS |
IEC 61375-2-5:2014 | Electronic railway equipment - Train communication network (TCN) - Part 2-5: Ethernet train backbone |
IEC 61375-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 1: General architecture |
IEC 61375-2-1:2012 | Electronic railway equipment - Train communication network (TCN) - Part 2-1: Wire Train Bus (WTB) |
UIC 541-1 : 8ED 2013 | BRAKES - REGULATIONS CONCERNING THE DESIGN OF BRAKE COMPONENTS |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.