• PD IEC/TS 60034-27-2:2012

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    Rotating electrical machines On-line partial discharge measurements on the stator winding insulation of rotating electrical machines

    Available format(s):  Hardcopy, PDF

    Superseded date:  21-12-2023

    Language(s):  English

    Published date:  31-10-2012

    Publisher:  British Standards Institution

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    FOREWORD
    INTRODUCTION
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Nature of PD in rotating machines
    5 Noise and disturbance
    6 Measuring techniques and instruments
    7 Installation of PD on-line measuring systems
    8 Normalization of measurements
    9 Measuring procedures
    10 Visualization of measurements
    11 Interpretation of on-line measurements
    12 Test report
    Annex A (informative) - Examples of Phase Resolved
            Partial Discharge (PRPD) pattern
    Bibliography

    Abstract - (Show below) - (Hide below)

    Gives a common basis for: - measuring techniques and instruments; - the arrangement of the installation; - normalization and sensitivity assessment; - measuring procedures; - noise reduction; - the documentation of results; - the interpretation of results; with respect to partial discharge on-line measurements on the stator winding insulation of non-converter driven rotating electrical machines with rated voltage of 3 kV and up.

    Scope - (Show below) - (Hide below)

    This part of IEC60034, which is a technical specification, provides a common basis for

    • measuring techniques and instruments;

    • the arrangement of the installation;

    • normalization and sensitivity assessment;

    • measuring procedures;

    • noise reduction;

    • the documentation of results;

    • the interpretation of results;

    with respect to partial discharge on-line measurements on the stator winding insulation of non-converter driven rotating electrical machines with rated voltage of 3kV and up. This technical specification covers PD measur ing systems and methods detecting electrical PD signals. The same measuring devices and procedures can also be used to detect electrical sparking and ar cing phenomena.

    NOTE The main differences between on-line measurements and o ff-line measurements are due to a different voltage distribution along the winding and various thermal and mechanical effects related to the operation, like vibration, contact arcing or temperature gradients between stator copper and stator iron core. Furthermore, especially for hydrogen-cooled machines the gas and the gas pressure is different for off -and on-line PD measurements.

    General Product Information - (Show below) - (Hide below)

    Committee PEL/2
    Document Type Standard
    Publisher British Standards Institution
    Status Superseded
    Superseded By

    Standards Referencing This Book - (Show below) - (Hide below)

    IEC 60270:2000+AMD1:2015 CSV High-voltage test techniques - Partial discharge measurements
    IEC TS 60034-27:2006 Rotating electrical machines - Part 27: Off-line partial discharge measurements on the stator winding insulation of rotating electrical machines
    IEC TS 61934:2011 Electrical insulating materials and systems - Electrical measurement of partial discharges (PD) under short rise time and repetitive voltage impulses
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective