PD ISO/IEC TS 22237-7:2018
Withdrawn
A Withdrawn Standard is one, which is removed from sale, and its unique number can no longer be used. The Standard can be withdrawn and not replaced, or it can be withdrawn and replaced by a Standard with a different number.
Information technology. Data centre facilities and infrastructures Management and operational information
Hardcopy , PDF
08-08-2022
English
25-05-2018
Committee |
TCT/7/3
|
DocumentType |
Standard
|
Pages |
50
|
PublisherName |
British Standards Institution
|
Status |
Withdrawn
|
This document specifies processes for the management and operation of data centres. The primary focus of this document is the operational processes necessary to deliver the expected level of resilience, availability, risk management, risk mitigation, capacity planning, security and energy efficiency. The secondary focus is on management processes to align the actual and future demands of users. Figure2 shows an overview of related processes. The transition from planning and building to operation of a data centre is considered as part of the acceptance test process in Clause6. Figure2 Data centre management processes overview NOTE1 Only processes specific for data centres are in the scope of this document. Business processes like people management, financial management, etc. are out of scope. NOTE2 Specific skill sets are required of those working in and operating a data centre.
Standards | Relationship |
ISO/IEC TS 22237-7:2018 | Identical |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.