PREN 12699 : DRAFT 2013
Superseded
A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.
View Superseded by
EXECUTION OF SPECIAL GEOTECHNICAL WORK - DISPLACEMENT PILES
08-06-2013
01-04-2015
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Information needed for the execution of the work
5 Geotechnical investigation
6 Materials and products
7 Considerations related to design
8 Execution
9 Supervision, monitoring and testing
10 Records
11 Special requirements
Annex A (informative) - Classification and examples
Annex B (informative) - Degree of obligation of the
provisions
Describes general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave and/or limiting vibration as well as removal of obstructions or to assist penetration.
| Committee |
TC 288
|
| DocumentType |
Draft
|
| PublisherName |
Comite Europeen de Normalisation
|
| Status |
Superseded
|
| SupersededBy |
| Standards | Relationship |
| 13/30280740 DC : 0 | Identical |