• Shopping Cart
    There are no items in your cart

PREN 12699 : DRAFT 2013

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

EXECUTION OF SPECIAL GEOTECHNICAL WORK - DISPLACEMENT PILES

Published date

08-06-2013

Superseded date

01-04-2015

Superseded by

EN 12699:2015

Sorry this product is not available in your region.
Summarise this standard

Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Information needed for the execution of the work
5 Geotechnical investigation
6 Materials and products
7 Considerations related to design
8 Execution
9 Supervision, monitoring and testing
10 Records
11 Special requirements
Annex A (informative) - Classification and examples
Annex B (informative) - Degree of obligation of the
        provisions

Describes general principles for the execution of displacement piles, that means piles which are installed in the ground without excavation or removal of material from the ground except for limiting heave and/or limiting vibration as well as removal of obstructions or to assist penetration.

Committee
TC 288
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Superseded
SupersededBy

Standards Relationship
13/30280740 DC : 0 Identical

Sorry this product is not available in your region.