PREN 13232-9 : DRAFT 2014
Current
Current
The latest, up-to-date edition.
RAILWAY APPLICATIONS - TRACK - SWITCHES AND CROSSINGS FOR VIGNOLE RAILS - PART 9: LAYOUTS
Published date
16-06-2014
Publisher
Sorry this product is not available in your region.
Summarise this standard
AI-generated summary
Foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Acceptance (General Design Process
Step 4 - See prEN 13232-2:2014)
Annex A (informative) - Layout acceptance form
Specifies the geometrical and non-geometrical acceptance criteria for inspection of layouts assembled both in the fabrication plant and at track site in case of layouts that are delivered non or partially assembled or in a 'kit' form.
| Committee |
TC 256
|
| DocumentType |
Draft
|
| PublisherName |
Comite Europeen de Normalisation
|
| Status |
Current
|
| Standards | Relationship |
| 14/30294813 DC : 0 | Identical |
| 14/30294813 DC : DRAFT JUNE 2014 | Identical |
| 03/310084 DC : DRAFT JUNE 2003 | Identical |
Sorry this product is not available in your region.