• There are no items in your cart

PREN 1395-5 : DRAFT 2016

Current

Current

The latest, up-to-date edition.

THERMAL SPRAYING - ACCEPTANCE INSPECTION OF THERMAL SPRAYING EQUIPMENT - PART 5: PLASMA SPRAYING IN CHAMBERS

Published date

13-06-2016

Sorry this product is not available in your region.

European foreword
1 Scope
2 Normative references
3 Terms and definitions
4 Principles of acceptance inspection
5 Procedure for acceptance inspection of vacuum
  components
6 Designation
7 Inspection report
Annex A (informative) - Inspection report for chamber
        and pump systems for plasma spraying in
        controlled atmosphere (initial test/retest)
Annex B (informative) - Diagram for the chronological
        sequence of the pressure change in camber and
        an example for the calculation of the leakage rate
Bibliography

Gives requirements for the acceptance inspection of thermal spraying equipment, in this case the pressurized part only for low pressure and controlled atmosphere plasma spraying, used in spray jobs to produce thermally sprayed coatings of reproducible quality.

Committee
TC 240
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Current

Standards Relationship
16/30339511 DC : 0 Identical
05/30133127 DC : DRAFT MAY 2005 Identical
16/30339511 DC : DRAFT JUNE 2016 Identical

05/30133115 DC : DRAFT MAY 2005 EN 1395-1 - THERMAL SPRAYING - ACCEPTANCE INSPECTION OF THERMAL SPRAYING EQUIPMENT - PART 1: GENERAL REQUIREMENTS

EN 1395-1:2007 Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 1: General requirements
EN 1395-4:2007 Thermal spraying - Acceptance inspection of thermal spraying equipment - Part 4: Plasma spraying

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.