• Shopping Cart
    There are no items in your cart

PREN 14198 : DRAFT 2014

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

RAILWAY APPLICATIONS - BRAKING - REQUIREMENTS FOR THE BRAKE SYSTEM OF TRAINS FOR GENERAL OPERATION

Published date

08-12-2014

Superseded date

01-11-2016

Superseded by

EN 14198:2016

Sorry this product is not available in your region.
Summarise this standard

Foreword
1 Scope
2 Normative References
3 Terms and definitions
4 Symbols and abbreviations
5 Requirements
6 Performances
Annex A (informative) - Infrastructure classes
Annex B (informative) - Brake performance categories
Annex C (informative) - Explanation of 'proven design'
        concept
Annex D (informative) - Corresponding standards EN - UIC
Annex E (normative) - Brake pipe pressure control system
Bibliography

Defines basic requirements for the braking of trains hauled by locomotives including individual vehicles operating on routes of the European railways and their infrastructure systems.

Committee
TC 256
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Superseded
SupersededBy

Standards Relationship
14/30270317 DC : 0 Identical
01/713391 DC : DRAFT SEP 2001 Identical

Sorry this product is not available in your region.