• PREN 1776 : DRAFT 2013

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    GAS INFRASTRUCTURE - GAS MEASURING SYSTEMS - FUNCTIONAL REQUIREMENTS

    Available format(s): 

    Superseded date:  01-12-2015

    Language(s): 

    Published date:  20-12-2013

    Publisher:  Comite Europeen de Normalisation

    Pure ENs are not available for sale, please purchase a suitable national adoption

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    Introduction
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 General requirement
    5 Basic requirements for measuring systems
    6 Energy Determination
    7 Design of gas measuring system
    8 Construction of a gas measuring installation
    9 Testing of the gas measuring installation/station
    10 Pre-commissioning and commissioning of the gas
       measuring installation
    11 Operation and maintenance
    12 Decommissioning
    Annex A (informative) - Guideline for the selection
            of meters
    Annex B (informative) - Sensor test procedures
    Annex C (informative) - Set of formulae to calculate
            volume or mass to energy
    Annex D (informative) - Uncertainty calculations for the
            energy determination
    Annex E (informative) - Examples of the assessment of
            conformity of the metrological performance
            of a gas measuring system taken from England
            and the Netherlands
    Annex F (informative) - Documentations and records
    Annex G (informative) - Typical examples of positions of
            gas measuring installations
    Bibliography

    Abstract - (Show below) - (Hide below)

    Describes functional requirements for the design, construction, testing, commissioning/decommissioning, operation, maintenance and where appropriate calibration, together with suitable documented provisions for all new gas measuring systems and any major changes of existing systems used for custody transfer.

    General Product Information - (Show below) - (Hide below)

    Comment Closes On
    Committee TC 234
    Document Type Draft
    Publisher Comite Europeen de Normalisation
    Status Superseded

    National Adoptions - (Show below) - (Hide below)

    Equivalent Standard(s) Relationship
    13/30277457 DC : 0 Identical

    Standards Referenced By This Book - (Show below) - (Hide below)

    BS EN 1474:1997 Installation and equipment for liquefied natural gas. Design and testing of loading/unloading arms
    EN 1474 : 1997 INSTALLATION AND EQUIPMENT FOR LIQUEFIED NATURAL GAS - DESIGN AND TESTING OF LOADING/UNLOADING ARMS
    I.S. EN 1474:1998 INSTALLATION AND EQUIPMENT FOR LIQUEFIED NATURAL GAS - DESIGN AND TESTING OF LOADING/UNLOADING ARMS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective