• PREN 459-3 : DRAFT 2009

    Superseded A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

    BUILDING LIME - PART 3: CONFORMITY EVALUATION

    Available format(s): 

    Superseded date:  01-06-2011

    Language(s): 

    Published date:  12-01-2013

    Publisher:  Comite Europeen de Normalisation

    Pure ENs are not available for sale, please purchase a suitable national adoption

    Sorry this product is not available in your region.

    Add To Cart

    Table of Contents - (Show below) - (Hide below)

    Foreword
    1 Scope
    2 Normative references
    3 Terms and definitions
    4 Factory production control by the manufacturer
      4.1 General requirements
          4.1.1 Definition and concept
          4.1.2 Work's quality manual
          4.1.3 Management system
          4.1.4 System of documentation
      4.2 Internal quality control
          4.2.1 Process control
          4.2.2 Measuring and testing
          4.2.3 Handling, storage, packaging and delivery
      4.3 Autocontrol testing of samples
          4.3.1 Sampling and testing
          4.3.2 Evaluation of results of autocontrol testing of
                samples
          4.3.3 Corrective action
          4.3.4 Measuring and test equipment for autocontrol
                testing
          4.3.5 Quality records
      4.4 Initial type testing of the building lime
    5 Other conformity evaluation tasks
      5.1 Surveillance, assessment and acceptance of the
          factory production control
          5.1.1 Inspection tasks
          5.1.2 Frequency of inspections
          5.1.3 Reports
      5.2 Initial inspection of the factory and the factory
          production control
          5.2.1 Inspection of a new factory
          5.2.2 Inspection of an existing factory
          5.2.3 Criteria for the assessment of the production
                equipment
          5.2.4 Criteria for the assessment of laboratories
    6 Actions in the event of non-conformity
      6.1 Actions to be taken by the manufacturer
      6.2 Actions to be taken in case of a non-conforming
          factory production control system
    7 Requirements for dispatching centres
      7.1 General
      7.2 Tasks for the intermediary
          7.2.1 Quality control
          7.2.2 Confirmation autocontrol testing of samples
                taken at the dispatching centre
    Bibliography

    Abstract - (Show below) - (Hide below)

    Describes the scheme for the evaluation of conformity of building lime to their corresponding product standard EN 459-1 by the manufacturer.

    General Product Information - (Show below) - (Hide below)

    Comment Closes On
    Committee TC 51
    Document Type Draft
    Publisher Comite Europeen de Normalisation
    Status Superseded
    Superseded By

    National Adoptions - (Show below) - (Hide below)

    Equivalent Standard(s) Relationship
    09/30205529 DC : 0 Identical

    Standards Referencing This Book - (Show below) - (Hide below)

    EN 459-2:2010 Building lime - Part 2: Test methods
    ISO 2854:1976 Statistical interpretation of data — Techniques of estimation and tests relating to means and variances
    EN 459-1:2015 BUILDING LIME - PART 1: DEFINITIONS, SPECIFICATIONS AND CONFORMITY CRITERIA
    EN 45011 : 1998 GENERAL REQUIREMENTS FOR BODIES OPERATING PRODUCT CERTIFICATION SYSTEMS
    • Access your standards online with a subscription

      Features

      • Simple online access to standards, technical information and regulations
      • Critical updates of standards and customisable alerts and notifications
      • Multi - user online standards collection: secure, flexibile and cost effective