• Shopping Cart
    There are no items in your cart

PREN 50191 : DRAFT 2009

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

ERECTION AND OPERATION OF ELECTRICAL TEST EQUIPMENT

Superseded date

01-10-2010

Published date

12-01-2013

Sorry this product is not available in your region.

Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Erection of test installations
  4.1 General
  4.2 Test stations with automatic protection
      against direct contact
  4.3 Test stations without automatic protection
      against direct contact
  4.4 Test laboratories and experimental stations
  4.5 Temporary test station
  4.6 Test station without test personnel in permanent
      attendance
  4.7 Additional requirements when using safety test
      probes
5 Operation of test installations
  5.1 General
  5.2 Personnel
  5.3 Preparation of tests, switching operations in
      test stations
  5.4 Performance of tests
Annex A (normative) - Permissible body currents and contact
        voltages
Annex B (informative) - Example of an application illustrating
        the prohibition zone and test area
Bibliography

Describes the erection and operation of fixed and temporary electrical test installations.

Committee
BTTF 128-2
DocumentType
Draft
PublisherName
Comite Europeen de Normalisation
Status
Superseded

Standards Relationship
09/30205281 DC : 0 Identical

Access your standards online with a subscription

Features

  • Simple online access to standards, technical information and regulations.

  • Critical updates of standards and customisable alerts and notifications.

  • Multi-user online standards collection: secure, flexible and cost effective.