• Shopping Cart
    There are no items in your cart

PREN 50518-2 : DRAFT 2008

Superseded

Superseded

A superseded Standard is one, which is fully replaced by another Standard, which is a new edition of the same Standard.

View Superseded by

MONITORING AND ALARM RECEIVING CENTRE - PART 2: REQUIREMENTS FOR TECHNICAL FACILITIES

Published date

12-01-2013

Superseded date

01-10-2010

Superseded by

EN 50518-2:2013

Sorry this product is not available in your region.
Summarise this standard

Introduction
1 Scope
2 Normative references
3 Definitions and abbreviations
   3.1 Definitions
   3.2 Abbreviations
4 Performance requirements
5 Communication requirements
6 Reception of signals
   6.1 General requirements
   6.2 Operator actions
7 Testing
   7.1 Daily checks
   7.2 Weekly checks
   7.3 Fault procedures and reporting
8 Data
   8.1 Client data
   8.2 Data of incoming signals
   8.3 Data of ARC external communications
   8.4 Log of operator actions
9 Data storage
10 Availability and verification of performance of the ARC
11 Contingency plan
   11.1 General
   11.2 Abnormal occurrence examples

Defines the technical requirements of an ARC. It also includes functional performance criteria and verification of performance.

Committee
TC 79
DocumentType
Draft
PublisherName
European Committee for Standards - Electrical
Status
Superseded
SupersededBy

Standards Relationship
NEN EN 50518-2 : 2013 Identical
DIN EN 50518-2 : 2014 Identical
08/30183528 DC : 0 Identical
NF EN 50518-2 : 2014 Identical
VDE 0830-5-6-2 : 2014 Identical

Sorry this product is not available in your region.