S.R. CEN ISO/TR 13624-2:2013
Current
The latest, up-to-date edition.
PETROLEUM AND NATURAL GAS INDUSTRIES - DRILLING AND PRODUCTION EQUIPMENT - PART 2: DEEPWATER DRILLING RISER METHODOLOGIES, OPERATIONS, AND INTEGRITY TECHNICAL REPORT (ISO/TR 13624-2:2009)
Hardcopy , PDF
English
01-01-2013
Foreword
Introduction
1 Scope
2 Normative references
3 Terms and definitions
4 Abbreviated terms
5 Coupled drilling riser/conductor analysis methodology
and worked example
6 Drift-off/drive-off analysis methodology and worked
example
7 Recoil analysis methodology and worked example
Bibliography
Applies to mobile offshore drilling units that employ a subsea BOP stack deployed at the seafloor.
DocumentType |
Standard
|
Pages |
103
|
PublisherName |
National Standards Authority of Ireland
|
Status |
Current
|
Standards | Relationship |
CEN ISO/TR 13624-2:2013 | Identical |
ISO/TR 13624-2:2009 | Identical |
API 2A WSD : 2014 | PLANNING, DESIGNING, AND CONSTRUCTING FIXED OFFSHORE PLATFORMS - WORKING STRESS DESIGN |
ISO 13624-1:2009 | Petroleum and natural gas industries — Drilling and production equipment — Part 1: Design and operation of marine drilling riser equipment |
ISO 3183:2012 | Petroleum and natural gas industries Steel pipe for pipeline transportation systems |
ISO 13628-11:2007 | Petroleum and natural gas industries — Design and operation of subsea production systems — Part 11: Flexible pipe systems for subsea and marine applications |
API 5L : 2012 | LINE PIPE |
API 2RD : 2013 | DYNAMIC RISERS FOR FLOATING PRODUCTION SYSTEMS |
API RP 16Q : 2017 | DESIGN, SELECTION, OPERATION, AND MAINTENANCE OF MARINE DRILLING RISER SYSTEMS |
API RP 17B : 2014 | RECOMMENDED PRACTICE FOR FLEXIBLE PIPE |
Access your standards online with a subscription
Features
-
Simple online access to standards, technical information and regulations.
-
Critical updates of standards and customisable alerts and notifications.
-
Multi-user online standards collection: secure, flexible and cost effective.